Lecture 2.1b: DoD Acquisition Process (SEF Ch 2). Dr. John MacCarthy UMBC CMSC 615 Fall, 2006. Chapter 2: 2.1 Introduction 2.2 Recent Changes 2.3 Acquisition Life Cycle 2.4 SE in Acquisition 2.5 Summary Points S2-A Technology Readiness Levels S2-B Evolutionary Acquisition Considerations

glenys
Download Presentation

Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 2.1b: DoD Acquisition Process (SEF Ch 2) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006

  2. Chapter 2: 2.1 Introduction 2.2 Recent Changes 2.3 Acquisition Life Cycle 2.4 SE in Acquisition 2.5 Summary Points S2-A Technology Readiness Levels S2-B Evolutionary Acquisition Considerations Notes: The current SEF Guide describes the OLDDODI 5000.2-R Acquisition Process We just discussed the NEW version (DODI 5000.2) Some Major Differences: Concept & Technology Development are separated by MS-A Name of the final Phase Changed Some new Milestones MNSs and ORDs are replaced by ICDs and CDDs Others USE THE NEW ACQUISITION WALL CHART As such, although many of the specifics of Chapter 2 are dated, the general approach described for iterative application of the SEP process to the DoD Acquisition Phases is still valid. Chapter 2 Conclusions are still valid. NEW DOD 5000 Process: OLD DOD 5000.R Process Chapter 2: Systems Engineering Managementin DoD Acquisition [1]

  3. Overview of OLD DoD 5000.R Concept Subphase Overview of OLD DoD 5000.R Technology Development Subphase Chapter 2: Systems Engineering Managementin DoD Acquisition [2] Note: This model is no longer valid. See NEW Acquisition wall chart for NEW Concept Development and Technology Development Phases.

  4. Overview of SE Process in OLD SDD Phase (System Requirements): Overview of SE Process in OLD SDD Phase (Design Requirements & Design): Chapter 2: Systems Engineering Managementin DoD Acquisition [3] Note: Time Scale is off. See NEW Acquisition wall chart for SDD Phase.

  5. Overview of SE Process in OLD Production and Deployment Phase: Overview of SE Process in OLD Operations & Support Phase: Chapter 2: Systems Engineering Managementin DoD Acquisition [4] Note: Time Scale is off. See NEW Acquisition wall chart for Product & Deployment and Sustainment & Disposal Phases.

  6. 2.5 Summary Points • The development, acquisition, and operation of military systems is governed by a multitude of public laws, formal DoD directives, instructions and manuals, numerous Service and Component regulations, and many inter-service and international agreements. • The system acquisition life cycle process is a model used to guide the program manager through the process of maturing technology based systems and readying them for production and deployment to military users. • The acquisition process model is intended to be flexible and to accommodate systems and technologies of varying maturities: • Systems dependent on immature technologies will take longer to develop and produce, • Systems that employ mature technologies can proceed through the process relatively quickly. • The system engineering effort is integrated into the systems acquisition process such that the activities associated with systems engineering (development of documentation, technical reviews, configuration management, etc.) support and strengthen the acquisition process. • The challenge for the engineering manager is to ensure that engineering activities are conducted at appropriate points in the process to ensure that the system has, in fact, achieved the levels of maturity expected prior to progressing into succeeding phases.

  7. S2-A Technology Readiness Levels • New DOD 5000.2 Process requires a Technology Readiness Assessment (TRA) prior to Milestone B (for Major Acquisitions) • Critical Technologies need to be identified and characterized by Technology Readiness Level (TRL) • Chart to right provides definition for each level. • For Milestone B, most (all) critical technologies should be at TRL 5/6 or higher

  8. Evolutionary Acquisition is Characterized by: Evolving Architectures Block Development & Incremental Delivery (each block provides additional or upgraded capability) Phased, concurrent development of Blocks/Increments Planning Considerations: Clear description of core system and subsystems/ components most likely to evolve Process for obtaining, evaluating and integrating operational feedback, technology advancements, & emerging commercial Products Planning for evolutionary block upgrade evaluation, requirements validation and program initiation Description of the management approach for evolutionary upgrades with in block and the constraints and controls associated with incremental delivery of capability Risk Analysis of the developmental approach, both technical and managerial S2-B Evolutionary Acquisition Considerations [1]

  9. S2-B Evolutionary Acquisition Considerations [2] • SE Planning Emphasis: • Openness and Modularity of the design of the core system architecture (to facilitate upgrades) • Structure of Baseline Documentation (upgrade flexibility) • Impact of Evolutionary Acquisition on baseline development and document control • Structure of technical reviews to best support acquisition decision points • Risk Management monitoring and controlling of the programmatic and technical complexity associated with EA. • EA Considerations and Relationships: