1 / 10

E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard

E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard. E166 Collaboration Meeting. Where Friday: Fuji Room, Bldg. 214 Saturday-Monday: ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints.

genna
Download Presentation

E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E166Collaboration MeetingSLAC, October 24-26, 2003J. C. Sheppard

  2. E166 Collaboration Meeting Where Friday:Fuji Room, Bldg. 214 Saturday-Monday:ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints

  3. SLAC Hotel E166 Collaboration Meeting Redwood Room, ROB Fuji Room, B214

  4. E166 Collaboration Meeting What Friday-Saturday Noon: E166 Background Test Saturday PM-Sunday Noon: E166 Polarized Positron Production Test Then Sunday PM-Monday PM: POWER Meeting (see Gudi Moortgat-Pick)

  5. E166 Collaboration Meeting, Saturday PM

  6. E166 Collaboration Meeting, Sunday, AM

  7. E-166 Activities EPAC/SLAC Approval in June, 2003 Formation of Background Test Review Committee, June 2003 Mini-Workshop on E166 Backgrounds: July, 2003 E166 Collaboration Meeting: October, 2003 Background Test Review: October 31, 2003 SLAC Tech. Div. Schedule Discussion: Week of November 3, 2003 EPAC Status Report: November 14-15, 2003

  8. E-166 Activities, cont’d T467: Detector and DAQ Development in FFTB: since April, 2003 Installation of Background Test equipment: February, 2004 Background Tests: February-July, 2004, tbd E166 Polarized Positron Production: January, 2005

  9. E166 Background Test T467: Background Test and Beam Results: Achim Weidemann Beam Tuning Strategies: Franz-Josef Decker Simulations: Overview-what do we want: John Sheppard Background simulation for E166: Yuri Batygin CsI Shielding: Gary Bower Results from FLUKA: Vinod Bharadwaj

More Related