Weekly Progress Report
90 likes | 262 Views
Weekly Progress Report. Kanghwan Kim EnHANTs Group June 19 th , 2012. Light Control System. Progress from last meeting Done with integration testing Getting several PCB designs reviewed. Light Control System. Light Control System. Weekly Goal To deal with several issues
Weekly Progress Report
E N D
Presentation Transcript
Weekly Progress Report Kanghwan Kim EnHANTs Group June 19th, 2012
Light Control System • Progress from last meeting • Done with integration testing • Getting several PCB designs reviewed
Light Control System • Weekly Goal • To deal with several issues • Power supply ripples, RC filter at Vcc, etc. • To finish designing PCB for the LED driver ckt • to be reviewed by Amrita M, John S, and Mike G • To order PCB and misc. ckt components, such as voltage regulators,SMT resistors / capacitors, etc.
Available Light Energy Measurement • Progress from last meeting • Improved the old program on Atmega326 • 3 levels for Visible/IR sensor (TCL2561)8 levels for RGB/Clear sensor (ADJD311),both by adjusting integration time • Prevents saturation overflow / minimize round-off error of obtained data • Also prevents premature & frequent gain change
Available Light Energy Measurement • Problems encountered • Cannot measure direct sunlight • Will focus on indoor energy measurement,including indirect / reflected sunlight • Unknown meaning of output value • Exhaustive experiment & calibration required,over ranges of frequency / intensity • Conversion from output data to irradiance(/intensity) and then to available energy
Available Light Energy Measurement • Weekly goal • To calibrate the board for meaningful information • Sets of measurement over ranges of frequency /intensity required • To find out relationship between gain (integration time) and the output data and calibrate the board • To write Matlab code that can generate meaningful energy data from measurement