Mitigation’s Value to Society Mitigation creates safer communities by reducing loss of life and property. PowerPoint Presentation
Download Presentation
Mitigation’s Value to Society Mitigation creates safer communities by reducing loss of life and property.

Loading in 2 Seconds...

play fullscreen
1 / 29

Mitigation’s Value to Society Mitigation creates safer communities by reducing loss of life and property. - PowerPoint PPT Presentation


  • 175 Views
  • Uploaded on

Governor’s Office of Homeland Security & Emergency Preparedness Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL). Mitigation’s Value to Society

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Mitigation’s Value to Society Mitigation creates safer communities by reducing loss of life and property.' - garan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Governor’s Office of Homeland Security & Emergency Preparedness Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL)

slide2
Mitigation’s Value to Society
  • Mitigation creates safer communities by reducing loss of life and property.
  • Mitigation enables individuals and communities to recover more rapidly from disasters.
  • Mitigation lessens the financial impact of disasters on individuals, the Treasury, state, local and tribal communities.
slide3

GOVERNMENT ENTITIES

  • State Agencies
  • Parishes/Communities

Eligible Sub-Applicants

*Private Non-Profits and Private Universities must apply through relevant local governments or State agencies.

TRIBAL NATIONS

  • Federally Recognized
  • State Recognized
slide4
Application Period FY10

PDM, FMA, RFC, SRL

  • National Application Period
    • June 1, 2009 – December 4, 2009
      • Must be submitted to FEMA by 3 PM EST
      • State will submit ALL FY 2010 applications by December 1
  • Applications must be submitted to GOHSEP in eGrants* by September 30, 2009

*Please email Kimberly Rodrigue for eGrants access.

management costs
Management Costs
  • Subapplicants may include a maximum of 5% of the total funds requested to support the activity.
    • Compensation of employees for the time devoted specifically to the performance of the award
    • Cost of materials used specifically for the purpose of the award
    • Travel expenses incurred specifically to carry out the award
slide6

Pre-Award Costs

  • Sub-Applicants may be reimbursed for pre-award cost for activities directly related to the development of the proposed activity.
  • Are only eligible if the application results in an approved project
  • Activities may include:
      • Workshops
      • Meetings
      • Data Collection (Planning Grants)
      • Development of BCA
      • Environmental/Historic Preservation data & documentation
      • Engineering Design (Project Grants)

Pre-Award Costs must be identified as a separate line item in the cost estimate

slide7
PDM

Section 203 of Stafford Act, 42 U.S.C. 5133

slide8
Pre-Disaster Mitigation (PDM)
  • Funding is provided through the National Pre-Disaster Mitigation Fund and is subject to Congressional appropriations.
  • FY09 - Approximately $90 million appropriated
  • FEMA will award each State at least $500,000 for the highest ranked eligible applications
  • The remainder of available funds will be awarded on a nationally competitive basis to the highest ranked applications
slide9

PDM Cost Share

75% Federal

25%Local

All Hazard Mitigation grants are paid on Cost-reimbursement basis

pdm mitigation project activities
PDM Mitigation Project Activities
  • Structure Elevation
  • Property Acquisition
    • Demoltion
    • Relocation
  • Stormwater Management Projects
  • Protective Measures for Utilities
  • Structural and Non-structural retrofitting of existing buildings
  • Minor localized flood reduction projects
slide11
PDM Mitigation Plans

Hazard Mitigation Plans

    • strategy for breaking the cycle of disaster damage, reconstruction, and repeated damage
    • a framework for developing feasible and cost-effective mitigation projects.
  • New Plan Development
  • Comprehensive Review and Update
    • A planning grant award must result in an adopted FEMA-approved hazard mitigation plan prior to the end of the 3-year performance period.
    • All Hazard Mitigation Plans must be updated every 5 years to maintain funding eligibility.
hazard mitigation plans cont
Hazard Mitigation Plans cont.

A FEMA approved Hazard Mitigation Plan is required for project funding in:

  • Hazard Mitigation Grant Program (HMGP)
  • Flood Mitigation Assistance (FMA)
  • Pre-Disaster Mitigation (PDM)
  • Severe Repetitive Loss (SRL)
slide13
FMA

Section 1366 of NFIA of 1968, 42 U.S.C 4104c

RFC

Section 1323 of the NFIA, 42 U.S.C. 4102A

SRL

Section 1361A of NFIA, 42 U.S.C. 4102A

slide14
Participation Requirements

FMA, RFC, & SRL

  • Properties must be NFIP insured at the time of project application and maintained at least through completion of the mitigation activity
    • The Sub-applicant may not be suspended, on probation, or withdrawn from the NFIP
    • Insurance must be kept in perpetuity on all mitigation activities except Acquisition
  • A FEMA-approved mitigation plan is required to receive project grants.
    • RFC only requires that the State have an approved plan.
slide15

Sub-ApplicationsRequirements

  • Mitigation Projects
    • Must be cost beneficial*
      • BCR must be >1.0
      • May use aggregate
    • Meet environmental and historical compliance
    • *All FY 2010 applications must use the new 4.0 BCA module.
slide16

FMA, RFC, & SRL Project Activities

  • Elevation of existing structures to BFE, ABFE, or higher
fma rfc srl project activities cont

Demolition

Relocation

FMA, RFC & SRL Project Activities cont.
  • Acquisition
  • All structures and slab must be removed
  • Property will remain deed restricted as open space in perpetuity.
fma rfc srl project activities cont1
FMA, RFC, & SRL Project Activities cont.
  • Minor Localized Flood Control
    • A percentage* of benefitting structures must be NFIP-insured
    • RFC and SRL must primarily benefit RFC and SRL properties

*Percentage will be decided by FEMA on a application-by-application basis.

slide19
Flood Mitigation Assistance (FMA)
  • FY 2009 National Funding Estimate was $35.7 Million
  • FY 2009 Louisiana Allocation was $3 Million
  • Maximum 5-year awards:
    • State:$20 Million
    • Local Government: $3.3 Million
    • State Agency: $10 Million
slide20

FMA Cost Share

75% Federal

25%Local

All Hazard Mitigation grants are paid on Cost-reimbursement basis

slide21
Repetitive Flood Claims (RFC)
  • NFIP insured structures that have one or more flood claim payments
  • Applicants must demonstrate that the proposed activities cannot be funded under the FMA program due to lack of capacity, including inability to manage the subgrant or lack of 25% match.
  • A local Hazard Mitigation Plan is not required
rfc cost share
RFC Cost Share

100%

Federal

All Hazard Mitigation grants are paid on a Cost-reimbursement basis

slide23
RFC National Ranking and Selection
  • Nationally Competitive Grant Program, no target allocation
    • Maximum of $10 Million annually nationwide.
  • FEMA will rank all eligible sub-applications based upon the greatest savings to the National Flood Insurance Fund
slide24
Severe Repetitive Loss (SRL)
  • Residential properties with at least four NFIP claim payments over $5,000 each (building and contents), and the cumulative amount of such claims payments exceeds $20,000; or
  • For which at least two separate NFIP claim payments (building only) have been made, with the cumulative amount of the building portion of such claims exceeding the value of the property
srl properties
SRL Properties
  • FEMA maintains a database of all validated SRL properties
    • 8000 Nationwide properties
    • 2950 Louisiana properties
slide26

SRL Cost Share

10% Local

The State of LA has added the Repetitive Loss Strategy into its Hazard Mitigation Plan therefore the SRL Cost Share is:

90% Federal

All Hazard Mitigation grants are paid on a Cost-reimbursement basis

srl fy09 re opening
SRL FY09 Re-opening
  • Will remain open until all $150 Million is allocated
  • Applications must be submitted to GOHSEP in eGrants by August 21, 2009
    • This date represents the first round of application deadlines for SRL FY 09
srl mitigation project activities
SRL Mitigation Project Activities
  • Pilot Reconstruction
    • Must have engineering report proving Elevation is not structurally feasible
    • Square footage may not exceed 10% of the existing home
    • Maximum Federal Construction Cost is $150,000