1 / 14

Classroom Technology Fall 2009 Update

Presentation to the UTFAB Tuesday, October 27, 2009 By - Douglas Satterfield Classroom Support Services-ACNS, Dougsat@Colostate.edu , ext.1-6038. Classroom Technology Fall 2009 Update. Classroom Technology 2009/ 2010. UTFAB Fall 2009 - Update. GA - Rooms Completed Summer 2009.

fstapleton
Download Presentation

Classroom Technology Fall 2009 Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to the UTFAB Tuesday, October 27, 2009 By - Douglas Satterfield Classroom Support Services-ACNS, Dougsat@Colostate.edu, ext.1-6038 Classroom Technology Fall 2009 Update

  2. Classroom Technology 2009/ 2010 UTFAB Fall 2009 - Update GA - Rooms Completed Summer 2009 Complete Summer of 2009 * Summer 2009 Facilities remodel

  3. Classroom Technology 2009/ 2010 UTFAB Fall 2009 - Update UTFAB/Applied Human Science 50/50 Funding – New Rooms Complete Summer of 2009

  4. Classroom Technology 2009/ 2010 12 Rooms – 7 Rooms to Maintain 5-year Refresh Cycle and Upgrade to Wide Screen HD capable resolutions Large Capacity rooms needing Technology Refreshes Complete Summer of 2009

  5. Classroom Technology 2009/ 2010 Current Smart Classroom Overview • 148 General Assignment Classrooms • 119 (80%) are technology equipped “Smart Classrooms” • 29 GA Classrooms remain w/o Smart Technology • 7 New Rooms FY2010 • 22 (non Smart) at the end of FY 2010. (85 %)

  6. Classroom Technology 2009/ 2010 8 New Large Lectern Classrooms Large Smart Classrooms with Wide Screen Projectors and Document Cameras

  7. Refresh Technology Highlights All Equipment is thoroughly tested before it is chosen for a classroom  • New wide-screen projectors – 5 years warranty • New screens • New upscaling DVD players (HDMI) • BluRay players in Auditorium Rooms • Updated control systems – 6 rooms • New, brighter lower maintenance projectors • Inorganic LCD panels / DLP Light Engines • Long-life filters • Best Image available at the best value

  8. Classroom Technology 2009/ 2010 Refresh Rooms Continued Continued: Projector upgrades and new Control Systems added *These rooms will have Controls System upgrades with no additional hardware cost – Equipment will come from existing stock.

  9. UTFAB Fall 2009 – Updated Totals

  10. Proposed Use of FY2010 Unallocated (Remaining) Funds • Integrate more Lectern PC’s to Smart Rooms – Approximately $1,000.00 per room • – Clark Awing Remodel – A103 – A102 – A201 – A202 – A203 • Additional LCD Flat Panels Monitors for Education 13 (Long Room) $3,000.00

  11. Continue with Classroom Upgrades and Technology Refreshes • To complete the remaining G.A. Classrooms by FY 2013 – (22 remaining beyond FY 2010) • Integrate more Lectern PC’s to Smart Rooms • Continue with I-Clicker Technology (49 rooms) • Add Small Document Camera to Small Lecterns Three Year Plan:

  12. Thank You! For your continued support From Everyone in Classroom Support Services

  13. Questions and Discussions • Questions regarding FY 10 Plan? • Other exciting new areas of the CSU Campus • Clark Awing Renovation • The New AIB Building • Rockwell expansion • Renovated TILT Building

More Related