WP3 Status / Hot Topics. SEE-GRID-2 PSC03 Meeting, Podgorica, Montenegro, October 30 – November 1, 2006. Antun Balaz WP3 Leader Institute of Physics, Belgrade antun@phy.bg.ac.yu. Overview. Activities status A3.2 A3.3 A3.4 A3.1 WP3 deliverables & milestones T-infrastructure deployment
E N D
WP3 Status / Hot Topics SEE-GRID-2 PSC03 Meeting, Podgorica, Montenegro, October 30 – November 1, 2006 Antun Balaz WP3 Leader Institute of Physics, Belgrade antun@phy.bg.ac.yu The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775
Overview • Activities status • A3.2 • A3.3 • A3.4 • A3.1 • WP3 deliverables & milestones • T-infrastructure deployment • WP3 Hot topics & Development areas • WP3 Issues & Action points SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20062
A3.2 Objectives • Objective: Network resource provision and assurance • WP3 will also deal with network resource provision, in close cooperation with the SEEREN2 project, thus ensuring stable connectivity for the RCs in the region. • Attention will be paid to Bandwidth-on-Demand requirements, to cater for bandwidth-intensive applications in case they need dedicated resources for particular experiments. • A3.2 - Network Resource Provision and BoD requirements (IPP) • Support liaison actions to ensure adequate network provision, including the requirements for Bandwidth-on-demand, if and where necessary depending on the application. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20063
A3.2 Status • A bandwidth on demand (BoD) service requirements questionnaire has been prepared and distributed. • Two applications with such requirements have been identified: • EMMIL (developed by International Business School, Hungary) • VIVE (developed by Belgrade University Computer Centre, Serbia). • Application requirements have been analyzed and EMMIL developers were contacted for some further input and clarifications. • The Data we’ve gathered so far was provided to Afrodite Sevasti (GRNET), leader of the GEANT2 Joint Research Action 3 “Bandwidth Allocation and Reservation”, for comments. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20064
A3.3 Objectives • Objective: CA and RA guidelines and deployment • Regional SEE-GRID catch-all Certification Authority (CA) will continue to operate providing certificates for countries without a CA. • Experienced CA team will provide support for per-country CA deployment and accreditation. The cycle to establish a National Grid CA will be in compliance with the procedures and accreditation process of the EU Grid Policy Management Authority (EUGridPMA). • Operations will be strengthened so as to support per-country CA operations • A3.3 - Deploy and operate Grid CAs (GRNET) • Should provide CA and RA guidelines and help establish per-country CAs to cover the authentication issues of accessing the grid. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20065
A3.3: Status of CAs in SEE • Status of CAs at the end of SEE-GRID (1) project • SEE-GRID CA (SEE catch-all) • HellasGrid CA (Greece) • NIIF CA (Hungary) • TrGrid CA (Turkey) • Current status (SEE-GRID-2) • Newly accredited CAs • SRCE CA (Croatia) • In progress of accreditation • Romania • Serbia • Bulgaria SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20066
A3.3: SEE-GRID CA (1) • Last SEE-GRID CA Training on June 2005 at Budapest • Current RAs: • Bulgaria • Romania • Albania • Bosnia and Herzegovina • University of Banja Luka • University of Sarajevo • F.Y.R.O.M. • Faculty of Natural Sciences and Mathematics-Skopje • Ss Cyril and Methodius Skopje Faculty of Electrical Engineering • Serbia • Montenegro • Moldova SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20067
A3.3: SEE-GRID CA (2) SEE-GRID CA in numbers (at the beginning of October 2006) SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 20068
BG.ACAD | CABulgarian Academic Certification Authority Stanislav Spasov spasov@acad.bg Luchesar Iliev iliev@acad.bg The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775
BG.ACAD | CA - Introduction • Established by Institute for Parallel Processing, Bulgarian Academy of Sciences (IPP-BAS): – September 2006; • Single CA in the Bulgarian academic field (NO subordinate certification authorities) : • provide stable services; • long-term commitment; • largest possible user community - serves the needs of the research and education community in the country for PKI services. • Hosted by IPP-BAS and operated by the Distributed Computing Systems and Networking department, responsible as well for the maintenance of the NREN and the other related services (BG.ACAD NOC, BG.ACAD CSIRT, etc.). • Supported in its operation by the government institutions related to the IT sector (e.g. the State Agency for Information Technology and Communications). SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200610
BG.ACAD | CACP/CPS overview (1) In Accordance with: • IETF RFC 3647; • IGTF guidelines (v4.0) • Inspired by CP/CPSs from other EUGridPMA approved CAs, i.e. • SEE-GRID CA Certificate Policy and Certificate Practice Statement • DutchGrid and NIKHEF Medium-security X.509 Certification Authority Certificate Policy and Certificate Practice Statement • AEGIS Certificate Policy and Certificate Practice Statement • CERN Certification Authority Certificate Policy and Certification Practice Statement • GridKa-CA Certificate Policy and Certification Practice Statement • SWITCH Certificate Policy and Certification Practice Statement; • Revision: 1.0 (current status - draft ) • OID: 1.3.6.1.4.1.26646.1.3.1.1 SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200611
BG.ACAD | CACP/CPS overview (2) • CP/CPS – delivered and published at http://www.eugridpma.org/review • Presented at 8th EUGridPMA Meeting, 5-6 Oct ‘06, Karlsruhe • Minor technicalities to be reconsidered and amended • Meets minimum requirements • Current status and plans: • Infrastructure is in place • Web site and repository – under construction http://www.ca.acad.bg • Signing machine ( laptop ) – under construction • Hope to be able to test the services successfully till the end of 2006 and get accreditation in January 2007 SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200612
BG.ACAD | CA - Infrastructure and physical security • Building has an admission desk • Server room is with RFID card access control . • Constant air conditioning, powerful UPS. • Automatic fire-extinguishing system and flood protection in room SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200613
A3.4 Objectives • User portal deployment and operations • A user-friendly multi-Grid access portal will be deployed, enabling universal and more flexible user access to the regional infrastructure. • The work on the SEE-GRID-2 portal should increase the user-friendliness of being able to select a grid and execute a workflow on the selected grid, so that interoperability of different grids is seamlessly and transparently solved at the application (workflow) level. • A3.4 - Provide a user portal (SZTAKI) • This activity will support the deployment of a user-friendly and mult-grid interoperable portal for convenient Grid access and usage. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200614
A3.4:P-Grade portal development status • New release of P-GRADE Portal: v2.4 • Documentation • SEEGRID Portal migration v2.3v2.4 done • User migration • Contact with external portals at SEEGRID partners • Two different development path • PS: • workflow level Parameter Study for EGEE és GT-2 grids • special generator and collector jobs • Under testing • GTbroker • Workflow Editor enhancement • Faster broker than EGEE broker • Based on GT2 • Tested and FULL Compatible with SEEGRID/VOCE SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200615
A3.4:New features / Ongoing work • New features in P-GRADE Portal 2.4 • Generic MPI support • Direct MPI job submission • MPI job submission using the LCG broker • Generic workflow level checkpointing • Ongoing and future work • Parameter study support • File Manager Portlet for Remote Storage Elements • Credential Manager for MyProxy SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200616
A3.4: Training / user activities • Portal user activities • Training and dissemination activities (SZTAKI) • EGEE Tutorial at ISGC 2006 - Taipei, Taiwan: 1 May • Induction to Grid Computing and EGEE - Budapest, Hungary: 11 May, 2006 • Grid application development on EGEE Grids by the P-GRADE Portal, -EGEE Earth science community, Paris, France: 22-23 June, 2006 • Joint Regional CE EGEE and SEEGRID-2 Summer School on Grid Application Support -Budapest, Hungary: 3-8 July, 2006 • P-GRADE Portal tutorial at the Baltic Grid Summer School - Tartu, Estonia: 4 - 8 July, 2006 • Grid Computing School in Conjunction with VECPAR ’06 - Rio de Janeiro, Brasil: 10-12 July, 2006 • Adding Workflow capabilities to ARC via the P-GRADE Portal - ARC Design Week -Budapest, Sárospatak, Hungary, 4-8 September, 2006 • P-GRADE Portal and ARC lectures and demonstrations at GridKa school 2006 - Karlsruhe, Germany: 13-14 September, 2006 • P-GRADE Portal lecture at the 4th Annual School of Young Scientists - Yevpatoria, Ukraine: 10 September, 2006 • Training and dissemination activities by (TUBITAK ULAKBIM) • Workflow application development • VO infrastructure test • Equation solver • Discovering Functional Modules in Large Scale Protein Networks • Evolutionary Boosting • Workflow Application repository SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200617
A3.4:P-Grade portal 2.4 Introduction New features of v2.4 • Revision of remote file handling: User option for non automatic copy to the worker node • Revision of rescue handling: The new functionality includes all types of resources involving the submissions to a Broker • Enhancement of verbosity level, localization and accuracy in the forwarding of the eventual errors occurring in the grid infrastructure • Protecting the Portal server by the introduction of a changeable limit of jobs being submitted and observed in one time. • Revision of MPI job handling: A totally new middleware ensures - and guaranties in defined circumstances - the success of submissions in case of MPI jobs • The new SEEGRID portal is up and running http://portal.p-grade.hu/seegrid SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200618
A3.1 Objectives (1) • Develop the next-generation SEE-GRID infrastructure • Next generation of EGEE MW (gLite), VOMS, WMS, information services and LFC will be assessed having in mind project and WP3 objectives • SEE-GRID infrastructure deployment of MW will follow and adapt its services according to the results of the above assessment. • Support in deployment and operations of RCs • Next generation monitoring services will be deployed so as to support the over-the-board infrastructure monitoring. • The current SEE-GRID helpdesk will be expanded in SEE-GRID-2, with the main goal of full EGEE interoperability. • Support the expansion and deal with the overall upgrade of the current infrastructure by proliferation of the participating RCs in each SEE country in order to increase: • the total available regional resources (CPUs, storage, etc.) thus boosting the capacity and reliability of the provision of Grid services at regional level, and • the diversity and distribution of participating teams per country thus strengthening cooperation and collaboration at national level. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200619
A3.1 Objectives (2) • A3.1 - Implementation of the advanced SEE-GRID infrastructure (UOB/IPP) • Deals with support for configuration, deployment and operations of the Resource Centres within the SEE-GRID pilot infrastructure, as well as transition of mature centres into EGEE. • Sub-activities: • A3.1.1 - Expand the existing SEE-GRID topology by inclusion of new sites per SEE country • A3.1.2 - Deploy M/W components and OS in SEE Resource Centers • A3.1.3 - Test the site installations in local and Grid mode • A3.1.4 - Operate the SEE-GRID infrastructure • A3.1.5 - Monitor the infrastructure performance and assess its usage • A3.1.6 - Certify and Migrate SEE-GRID sites from Regional Pilot to Global production-level eInfrastructures SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200620
A3.1 Overview • Infrastructure status and expansion plans per country • Operations • SLA conformance monitoring per site for the next PSC meeting • gLite assessment & deployment status • Helpdesk tickets procedures and statistics analysis • Operational & monitoring tools deployment & integration • SEE-GRID reorganized Wiki status • HGSM • SAM (+ porting to MySQL) • BDII • GridICE • SEE-GRID GoogleEarth • SEE-GRID GoogleMaps • GStat • R-GMA • RTM • MonALISA SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200621
A3.1: Overview per country • Greece • Switzerland • Bulgaria • Romania • Turkey • Hungary • Albania • Bosnia and Herzegovina • FYR of Macedonia • Serbia • Montenegro • Moldova • Croatia • Overall infrastructure status • Expansion plans • Overview of A3.1 work • Resources committed to the SEEGRID VO • Other WP3 related effort SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200622
A3.1: Greece (1) • Number of Sites: 1 • HG-01-GRNET • Number of CPUs: 64 • Storage: 4.78 TB • MW Version: GLITE-3_0_2 • SEEGRID VO Resources • MAUI FAIR SHARE 20% • Max usage 60% • MIN CPUs: 64*20% ~ 13 CPUs • MAX CPUs: 64*60% ~ 38 CPUs • Expected (Based on Usage of other VOs): 64*30+% ~ 20 CPUs • GlueCEPolicyMaxRunningJobs: 38 • Expansion? SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200623
A3.1: Greece (2) • Operations of SEEGRID training CA • Operation of rb/bdii/VOMS for the SGDEMO VO (Training SEEGRID VO) SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200624
A3.1: Switzerland/CERN • Mainly development and support • Contributions to the SEE-GRID Wiki • Resources – should we ask for some? SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200625
A3.1: Bulgaria (1) • Status of the infrastructure and plan for expansion • 4 sites (EGEE/SEEGRID) infrastructure – significantly expanded now • Myrinet interconnection for low-latency MPI – bridging HPC with Grid • New site SEE-GRID only in the third party- FMI-SU in preparation with 20 WNs. • Core services, monitoring tools: • R-GMA (IPP responsible) - working • FTS (IPP responsible): first succesful local testing. Lack of SRM-enabled SEs in SEE-GRID was a problem, but good progress lately • Nagios monitoring proposition – can save manpower • Sites operation and ticket handling status/problems • Replace e-mails with tickets when R-GMA access requested • MPI problems at some sites – tickets created. • High level of job submission problems – tickets created, but nagios recommended as a solution • Slow response on tickets – apparently a communication problem • HGSM access not working • Contributions to the SEE-GRID Wiki SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200626
A3.1: Bulgaria (2)Nagios monitoring SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200627
A3.1: Bulgaria (3)New SEE-GRID-2 site under in FMI-SU • The site will be available before the end of the 2006. • User inteface node: running Debian GNU/Linux. • CE – running the pbs ( torque) and bdii. Using the maui scheduler. • Combine education and application porting activities SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200628
A3.1: Romania (1)Infrastructure and Services Status • Sites: • 8 registered in HGSM: RO-01-ICI, RO-03-UPB, RO-05-INCAS, RO-06-UNIBUC, RO-07-NIPNE, RO-08-UVT, RO-09-UTCN, RO-10-TUIASI. • RO-08-UVT & RO-09-UTCN are supported by GridMOSI national CEEX project • RO-05-INCAS not yet certified, site admin issue. • RO-10-TUIASI is experimenting grid testbeds • gLite 3.0, apart 1 certified site SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200629
A3.1: Romania (2)Future Plans • RO-07-NIPNE migrated to EGEE • hardware upgrade: currently 40 CPUs only for SEEGRID VO • 70 WNs dual core 3 Ghz(planned) • 10 Gb link to RoeduNET • 3TB DPM Storage Element • RO-09-UTCN • volunteered for FTS experimenting • RO-08-UVT • myrinet upgrade • 16 CPUs for SEEGRID VO • RO-01-ICI • Storage upgrade: 1 Tb SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200630
A3.1: Romania (3)Sites operation • RO-01-ICI maintains SEE-GRID Helpdesk • Mixed reaction to tickets by RoGrid sites • RO has the most total and open tickets in SEEGRID 2 • tickets not closed in 1 month • Not enough operational resources • Number of sites increased -> inceased support effort and operations • solution sought SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200631
A3.1: Romania (4) Core services, Monitoring, CA • RO-01-ICI deployed a RB/BDII for RO sites • RO-03-UPB deployed MonALISA with a SEEGRID Repository • very good cooperation with OSG and other projects which use MonALISA. • Willingness to contribute to SEEGRID Wiki • to be decided how • Romanian CA is at ROSA (Romanian Space Agency) • writing CP/CPS Document phase SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200632
A3.1: Turkey (1)Current TR-Grid Infrastructure SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200633
A3.1: Turkey (2) Current TR-Grid Infrastructure SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200634
A3.1: Turkey (3)Forthcoming TR-Grid Infrastructure SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200635
A3.1: Turkey (4)Status of TR-Grid Infrastructure Project • Our major project to form a National eInfrastructure is supported by TUBITAK research budget (~500.000 €) • Objective: • To build an eInfrastructure that is distributed among universities which will give computational resources to researchers all around the country. • To make this huge computing power a part of EGEE infrastructure. • To extend this infrastructure nationwide. • Tender for National e-Infrastructure was finalized in July 2006. • WAN interconnection of all sites are upgraded and ready for site deployment. • LAN equipment for all sites have been received. • Servers have been received, site installations will have been completed by the end of 2006. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200636
A3.1: Turkey (5)Sites Operation/Ticket Handling • All TR-* SEE-GRID sites except TR-06-SELCUK have been upgraded to GLITE-3.0 • Necessary security updates and other patches announced have been done. • Temporary network problems with TR-06-SELCUK • Typical problems encountered during routine site operations: • Job Submission Failures at gLite-CE due to • Failure of BLParserPBS daemon • Failure of fetch-crl cron • SSH problem from WNs to CE • Site/user support is provided via national and SEE-GRID helpdesks. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200637
A3.1: Turkey (6)Wiki Pages • Basic user and site administration documents are provided in native language on TR-Grid wiki pages • http://wiki.grid.org.tr • So far, there has been no contribution to the re-organized SEE-GRID wiki pages. • WP3 personnel of ULAKBIM will soon contribute to the SEE-GRID wiki. • Possible future contributions to the parts: • Experiences from site/service installations, upgrades • Installation of specific services and tools – VOMS • Policy documents SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200638
A3.1: Turkey (7)Core Services • We have been operating secondary SEE-GRID RB/BDII service – ui.ulakbim.gov.tr • LFC – lfc.ulakbim.gov.tr – Currently half terabyte of data is catalogued. LFC server is now serving national VOs. It can support forthcoming possible SEEGRID VOs. • Myproxy – myproxy.ulakbim.gov.tr • VOMS service for national VOs – voms.ulakbim.gov.tr • WMS server – wms.ulakbim.gov.tr • SFT server (planned to be installed for custom tests of TR sites and national VOs) SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200639
A3.1: Turkey (8)Monitoring Tools, P-Grade Portal • HGSM software has already been adopted to export data for monitoring tools like GridICE, RTM, GStat. • ULAKBIM has re-developed the HGSM tool to support multi Grid projects. • Cross project collaboration: Currently HGSM is also being used by EUMEDGRID and planned to be used by EELA. Required operational/deployment support is provided by ULAKBIM. • Googlemap tool has been developed and is being used to retrieve the information given by GIIS monitor for a selected site. • P-Grade – For national users a localized P-Grade portal will be in operation in the first quarter of 2007. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200640
A3.1: Turkey (9)TR-Grid VOs • Current status of national VOs: • trgrida: 28 users (computational chemistry) • trgridb: 24 users (molecular dynamics) • trgridc: 3 users (earth science) • trgridd: 11 users (training) • trgride: 7 users (computational physics) • trgridf: 7 users (UlakNET network statistics) • trgridg: 3 users (Metallurgical science) SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200641
WP3: TurkeyCA Status • Since accredited in 5th EUGridPMA Meeting in September 2005, TR-Grid CA has been operating and providing certification services of TR-Grid. • In order to arise grid security awareness among users, related wiki pages are present and being updated in native language. • So far 28 host, 1 service and 68 user certificates have been issued by TR-Grid CA, at present 90 valid certificates in total. SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200642
A3.1: Hungary (1)Infrastructure summary • Infrastructure (now) • n27: • Dell Precision 410 M; 2xPIII 500M; 2x128M DIMM; • QUANTUM ATLAS IV 9 WLS SCSI 9G; 3Com 3c905B • n28: • Dell Precision 410 M; 2xPIII 500M; 2x128M DIMM; • QUANTUM ATLAS IV 9 WLS SCSI 9G; 3Com 3c905B • Site hardware upgrade (on-going task) • 4 new, dedicated P4 • CPU:2.4 GHz • 512 MB memory + additional storage • Software upgrades • Security patches (2.1.5 Torque update) SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200643
A3.1: Hungary (2)Contributions to the SEE-GRIDWiki User and developer oriented material New entries on the Wiki: • For Developers Case studies how-to use P-GRADE Portal for Grid application development • For Users User induction Manual for P-GRADE Portal SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200644
A3.1: Albania (1)Migration to gLite 3.0 • FIE (Faculty of Electrical Engineering) • The first to migrate to gLite 3.0 • INIMA (Institute of Informatics and Applied Mathematics) • Followed a month latter • FSN (Faculty of Natural Sciences) • Has prepared the cluster for integration in SEEGRID • Directly installed gLite 3.0 • Some delays related with certificates SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200645
A3.1: Albania (2)Further development plans • Further development plans • Improve the hardware creating dedicated to SEEGRID clusters • Actually existing clusters are used for other purposes • Critical for INIMA and FSN • Inclusion of new sites considered as [temporary] problematic • Difficult to find sites with enough experience on Linux systems • Necessary to create a “friendly” environment for grid applications and involve other domains researchers to experiment with grids, as a prerequisite to justify involvement in the project and improve the sustainability • Improve the access to grid structures for non ICT researchers through simple web pages that would permit easy upload, compilation and execution of jobs in remote Linux sites SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200646
A3.1: Albania (3)Sites operations • Problems during system upgrades to gLite 3.0.2 • Eventual changes in SSH packages • Problems while applying security patches • Ticketing • Tickets related with minor coordinate problems resolved and closed • Other issues • Difficult to access testing and monitoring sites in MK SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200647
A3.1: Albania (4)Contributions to SEEGRID Wiki • Experience of migration to gLite from FIE and INIMA included in SG GLITE-3 0 Assessment Notes: • AL-02-FIE Notes • AL-01-INIMA Notes SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200648
WP3: Albania (1)Network provision • Connectivity for each of sites (INIMA, FIE, FSN) is provided by different ISPs, with bandwidth range between 1 Mbps – 2 Mbps • QoS and BoD are not implemented • SEEREN2 connectivity under consideration for 2007 SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200649
WP3: Albania (2)Status of CA • CA status remains delegated to a single contact point [person] for SEEGRID activities only • Creation of formal CA organization remains as a task related with the establishment of NGI in Albania SEE-GRID-2 PSC03 Meeting – Podgorica, Montenegro, October 30 – November 1, 200650