Frank compressor blog

The second chamber is depressurized downward to ambient pressure by the purge valve. As a piece of the desiccant passes through the needle valve or orifice plate, a portion of the dry compressed air flushes the desorbed moisture out. As the regeneration is finished, the purge valve closes, and the tower gradually depressurizes to line pressure, ensuring a seamless changeover. A 5-minute additional drying period at atmospheric pressure results in an effective dewpoint of -40u00b0C or even better. The re-pressurization phase of the regeneration process only lasts about 60 seconds. This idea underlie

frank14
Download Presentation

Frank compressor blog

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


More Related