EXECUTING AN ERECTION OF FORMWORK • Formwork is a very complex and rigid process that requires correct and accurate measurements. Verify all lines of formwork, check the levels and accuracy of measurement before continuing to formwork. • The sides and bottoms of the earth forms can be hand-trimmed to remove loose dirt. Align the different components of formwork depending on the structural specifications.
BELOW ARE SOME OF THE COMPONENTS OF WALL FORMS; • Braces • Panel Sheath • Ties and Spreads • Studs
CONCLUSION • Formwork erection suggests that the layout drawings should remain the same. No deviations and must be approved by a qualified engineer.Any alteration may reduce their stability, this means there should be adequate bracing while setting formwork.The deck system that supports the concrete should not be supported by the wall forms unless they are part of the structure design.