html5-img
1 / 10

Point Thomson Initial Production System Project

Point Thomson Initial Production System Project . Alaska North Slope (ANS). Point Thomson. Prudhoe Bay. Kuparuk. Badami. TransAlaska Pipeline. Oil Pipelines. Point Thomson Unit - Background. Discovered in 1977 60 miles east of Prudhoe Bay and TransAlaska Pipeline

forbes
Download Presentation

Point Thomson Initial Production System Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Point Thomson Initial Production System Project

  2. Alaska North Slope (ANS) Point Thomson Prudhoe Bay Kuparuk Badami TransAlaska Pipeline Oil Pipelines Point Thomson Unit - Background • Discovered in 1977 • 60 miles east of Prudhoe Bay and TransAlaska Pipeline • Point Thomson Unit covers ~150 square miles • Located in remote and environmentally sensitive area • Thomson Sand reservoir contains an estimated 8 trillion cubic feet (TCF) of gas and 200 million barrels of condensate (about 25% of known North Slope gas reserves)

  3. Point Thomson Unit - Locations

  4. Module 101 • Compression Module • 2,700 S Tons (52% Steel) • 535 Isos • 116ft x 92ft x 58ft • Main Equipment • Recip Compressors • Pulsation Dampeners • SDVs

  5. Module 103 • Separation / Dehydration • 2,100 S Tons (51% Steel) • 845 Isos • 170ft x 55ft x 64ft • Main Equipment • Separation Vessels • Heat Exchangers • Flash Gas Compressor

  6. Module 104 • Utility Systems • 1,600 S Tons (52% Steel) • 320 Isos • 116ft x 60ft x 78ft • Main Equipment • Instrument Air • N2 Generator • Cooling / Heating Mediums

  7. Module 105 • Power Generation Systems • 2,600 S Tons (52% Steel) • 320 Isos • 116ft x 60ft x 78ft • Main Equipment • Power generation • Waste Heat Recovery Units

  8. Module 126 • Control Room • 350 S Tons (57% Steel) • 26 Isos • 90ft x 50ft x 28ft • Main Equipment • Control Systems • HVAC System

  9. Clustering Assembly layout “clustering” mirrors the final layout on the North Slope.

  10. Transit to Alaska

More Related