  • Uploaded on

Point Thomson Initial Production System Project . Alaska North Slope (ANS). Point Thomson. Prudhoe Bay. Kuparuk. Badami. TransAlaska Pipeline. Oil Pipelines. Point Thomson Unit - Background. Discovered in 1977 60 miles east of Prudhoe Bay and TransAlaska Pipeline

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Point Thomson Initial Production System Project' - forbes


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Point Thomson

Initial Production System Project

point thomson unit background

Alaska North Slope (ANS)

Point Thomson

Prudhoe Bay

Kuparuk

Badami

TransAlaska

Pipeline

Oil Pipelines

Point Thomson Unit - Background
  • Discovered in 1977
  • 60 miles east of Prudhoe Bay and TransAlaska Pipeline
  • Point Thomson Unit covers ~150 square miles
  • Located in remote and environmentally sensitive area
  • Thomson Sand reservoir contains an estimated 8 trillion cubic feet (TCF) of gas and 200 million barrels of condensate (about 25% of known North Slope gas reserves)
module 101
Module 101
  • Compression Module
  • 2,700 S Tons (52% Steel)
  • 535 Isos
  • 116ft x 92ft x 58ft
  • Main Equipment
    • Recip Compressors
    • Pulsation Dampeners
    • SDVs
module 103
Module 103
  • Separation / Dehydration
  • 2,100 S Tons (51% Steel)
  • 845 Isos
  • 170ft x 55ft x 64ft
  • Main Equipment
    • Separation Vessels
    • Heat Exchangers
    • Flash Gas Compressor
module 104
Module 104
  • Utility Systems
  • 1,600 S Tons (52% Steel)
  • 320 Isos
  • 116ft x 60ft x 78ft
  • Main Equipment
    • Instrument Air
    • N2 Generator
    • Cooling / Heating Mediums
module 105
Module 105
  • Power Generation Systems
  • 2,600 S Tons (52% Steel)
  • 320 Isos
  • 116ft x 60ft x 78ft
  • Main Equipment
    • Power generation
    • Waste Heat Recovery Units
module 126
Module 126
  • Control Room
  • 350 S Tons (57% Steel)
  • 26 Isos
  • 90ft x 50ft x 28ft
  • Main Equipment
    • Control Systems
    • HVAC System
slide9

Clustering