1 / 28

NAME STATUS AND ISSUES

NAME STATUS AND ISSUES. NAME Homepage: http://www.joss.ucar.edu/name. NAME 2004 Enhanced Observing Period. NAME 2004 EOP ACTION ITEMS. Atmospheric Profiles. Obtain a firm schedule for installation of each ISS site. Determine status of request for 4 x daily

floyd
Download Presentation

NAME STATUS AND ISSUES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NAME STATUS AND ISSUES NAME Homepage: http://www.joss.ucar.edu/name

  2. NAME 2004 Enhanced Observing Period

  3. NAME 2004 EOP ACTION ITEMS Atmospheric Profiles • Obtain a firm schedule for installation of • each ISS site. • Determine status of request for 4x daily • soundings at Puerto Penasco and Kino Bay. • Resolve discrepancies between the • background frequency of launches in the • budget hexagon (SMN 2x -vs- ISS 4x daily). • Determine status of Torreon site; H -vs-He. • Resolve remaining staffing issues

  4. NAME 2004 EOP ACTION ITEMS Atmospheric Profiles • Status of discussion on radiosonde • requirements at Costa Rica and Belize • City for 2x daily soundings and the • possibilities for NHC support? • Status of PIBAL network • (M. Douglas) • Finalize arrangements for SMN, ISS, ship, • and any other soundings to transmit to the • GTS gateway. • Finalize expendables table and provide to • Project Office, FOC’s and NCEP

  5. NAME 2004 EOP ACTION ITEMS Radars •  Obtain a firm schedule for the • upgrades and operations of the 4 SMN • radars. • Status of S-POL shipping • arrangements

  6. NAME 2004 EOP ACTION ITEMS Aircraft Operations:NOAA P-3 •   Should we identify a radar PI for coordinated flight operations and acquisition of X-band Doppler radar data (NOAA P-3)?

  7. NAME 2004 EOP ACTION ITEMS Surface Met Instruments • Determine needs for additional • coordination with SMEX04. • Prepare a map of the distribution of • simple raingauges.

  8. NAME 2004 EOP ACTION ITEMS Ship Observations: Altair •  Determine how many extra sondes are • allocated to the Altair, and where • they can best be used at ISS sites. •  Finalize arrangements for deploying a • tethersonde aboard the Altair.

  9. NAME 2004 IOP CALLS

  10. NAME Modeling and Data Assimilation: A Strategic Overview NAME Science Working Group* June 2003

  11. http://www.joss.ucar.edu/name

More Related