Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Download
1 / 11

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) - PowerPoint PPT Presentation


  • 61 Views
  • Uploaded on

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IEEE802.15.3: MAC Committee Plan Leading Into Bellevue Interim Date Submitted: July, 2001 Source: Allen Heberling Company: XtremeSpectrum

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)' - fidelio-langan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Project ieee p802 15 working group for wireless personal area networks wpans

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Submission Title: IEEE802.15.3: MAC Committee Plan Leading Into Bellevue Interim

Date Submitted: July, 2001

Source: Allen Heberling Company: XtremeSpectrum

Address: 8133 Leesburg Pike, Suite 700, Vienna, Virginia 22182

Voice: +1.703.269-3022, FAX: +1.703.749.0249, E-Mail: aheberling@xtremespectrum.com

Re: [ ]

Abstract: TG3 MAC plan

Purpose: 1) To inform the IEEE 802.15.3 regarding the activities the TG3 MAC committee is planning for the time interval leading up to the Bellevue Interim Meeting.

Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

Release: The contributor acknowledges and accepts that these viewgraphs become(s) the property of IEEE and may be made publicly available by P802.15.

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee plan for the time interval leading up to bellevue

TG3 MAC Committee Plan for the Time Interval Leading up to Bellevue

Allen D. Heberling, XtremeSpectrum


Overview
Overview Bellevue

  • Still to many open issues in D05

  • TG3 MAC Activities planned for the time interval leading up to the Bellevue Interim meeting.

Allen D. Heberling, XtremeSpectrum


Current holes in d05
Current Holes in D05 Bellevue

  • 6.3.x.y MLME-Channel-Time.req/ind/rsp/confirm

  • 6.3.x.y MLME-CoordHndOvr.req/ind/confirm

  • 6.3.x.y MLME-StreamConnect.req/ind/confirm

  • 6.3.x.y MLME-StreamDisconnect.req/ind/confirm

Allen D. Heberling, XtremeSpectrum


Current holes in d05 continued
Current Holes in D05 continued… Bellevue

  • 6.3.x.y MLME-Repeater.req/ind/confirm

  • 6.3.x.y MLME-ChannelStatus.req/ind/confirm

  • Annex A 15.3 MAC SDL Model

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

  • 7 Conference Calls Scheduled

    • Dates: 7/24, 7/31, 8/7, 8/14, 8/21,9/4, 9/11

    • Purpose:

      • Monitor/report progress

      • Continue resolving open issues

      • Generation of Amendments for inclusion into D0.7, one week prior to Bellevue Interim

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim1
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

  • Scheduled an Ad hoc MAC meeting for August 28,29 at the Motorola Facility in Schaumburg, Ill.

    • Purpose:

      • Approve resolved open issue amendments

      • Apply open issue amendments to draft standards

      • Incorporate Power Management and Transmit Power Control clauses into draft standard

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim2
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

Prepare or Complete these clauses:

  • 6.3.x.y MLME-Channel-Time.req/ind/rsp/confirm

  • 6.3.x.y MLME-CoordHndOvr.req/ind/confirm

  • 6.3.x.y MLME-StreamConnect.req/ind/confirm

  • 6.3.x.y MLME-StreamDisconnect.req/ind/confirm

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim3
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

  • 6.3.x.y MLME-Repeater.req/ind/confirm

  • 6.3.x.y MLME-ChannelStatus.req/ind/confirm

    • R. Roberts to author w/ inputs from staff.

  • Power Management Clause

    • Creation J.Bain ; R. Gubbi

    • Review and Selection by MAC Committee

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim4
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

  • Transmit Power Control Clause

    • Creation J.Bain/R.Roberts; R. Gubbi

    • Review and Selection by MAC Committee

  • Security/Privacy Clause

    • Creation G. Rasor

    • Review and Selection by MAC Committee

Allen D. Heberling, XtremeSpectrum


Tg3 mac committee activities planned for the interval leading up to the bellevue interim5
TG3 MAC Committee Activities Planned for the Interval Leading Up To the Bellevue Interim:

  • Complete MSCs and a high level 15.3 SDL Model for the Bellevue Plenary.

    • Creation A. Heberling

    • Review by MAC Committee

Allen D. Heberling, XtremeSpectrum