An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007

  2. The portable classroom Time clock User control Electric heating No scheduling capability Electric heat pumps No A/C Exhaust fans Limited windows No demand charges

  3. Part of PSE rebate program for schools • List of eligible equipment • Variable rebate amounts depending on which pieces of equipment installed • Application for rebate • Rebate amount is close to cost of controller

  4. Portable classroom control project process • Project research (cost/benefits, other data) • Make pitch to organization • Rebate application, work with PSE early • Find a contractor to do the work • Commence with project • Set up temperature set-points, times, etc • Verify avoided costs, consumption • Receive rebate

  5. The Project • 127 portable classrooms • Upgraded thermostat controller • Connected to District DDC through network • Control setpoints via DDC system • Can verify temps, setpoints, trends, etc • Ability to remotely shut down all portables • Scheduling, snow day, etc

  6. After-project analysis using PSE’s EIS March 2005 through February 2007

  7. Weekly analysis shows weekend shutdown Feb 24, 2007 through April 24, 2007

  8. Daily profile 2005: High peak, runs during night hours First week of March, 2005

  9. Daily profile 2006: Systems running 24/7 First week of March, 2007

  10. Daily profile shows lower demand, lower night consumption First week of March, 2007

  11. Avoided electricity calculations • Mar 2005 • Cost - $75.22 • kWh – 942.26 • Mar 2006 • Cost - $182.72 • kWh – 2,391.50 • Mar 2007 • Cost - $62.97 • kWh – 766.45 942.26 + 2391.50 2 = 1,666.9 – 766.45 = 900 kWh per year or 54%

  12. Avoided cost calculations • Mar 2005 • Cost - $75.22 • kWh – 942.26 • Mar 2006 • Cost - $182.72 • kWh – 2,391.50 • Mar 2007 • Cost - $62.97 • kWh – 766.45 $75.22 + $182.72 2 = $128.97 - $62.97 = $66.00 per year or 51%!

  13. Avoided cost survey • 18 portables at various sites (14% of total) • Used PSE’s Energy Interval Service for data • Total electricity cost March 2006: $2,468.39 • Total electricity cost March 2007: $1,854.49 • Avoided monthly cost for sample: $613.90 • x 10 months: $6,139.00 annual avoided cost • / 18 portables = $341.05 per portable, per year • x 127 portables = $43,314.05 (estimated annual avoided cost, based on survey)

  14. Total cost/benefit • Estimated annual savings: $43,314 • Total project cost: $110,642 • Simple payback (no rebate): 2.6 years • PSE rebate: $29,750 • Actual project cost: $110,642 - $29,750 = $80,892 • Simple payback (with rebate): 1.9 years

  15. Thank you!! • Questions??