I 95 pioneer trail interchange
Download
1 / 5

I-95/Pioneer Trail Interchange - PowerPoint PPT Presentation


  • 124 Views
  • Uploaded on

I-95/Pioneer Trail Interchange. County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange to be evaluated for need & impacts . son Blvd. Williamson Blvd Extension (Funded for Construction ). S William. ETDM Environmental Screening.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' I-95/Pioneer Trail Interchange' - fia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
I 95 pioneer trail interchange
I-95/Pioneer Trail Interchange

County & Port Orange request restoring interchange to TPO “unfunded” LRTP

To allow interchange to be evaluated for need & impacts

son Blvd

Williamson Blvd Extension (Funded for Construction)

S William

ETDM

Environmental Screening

New Interchange Location

PD&E

LRTP

Turnbull Bay Rd

IJR

Pioneer Trail


I 95 pioneer trail interchange1
I-95/Pioneer Trail Interchange

  • Historical Summary

  • Williamson Blvd previously crossed

  • I-95 with interchange

  • 2010 LRTP (VCATS) Highway Needs Plan (Mar ‘83)

  • 2015 LRTP MPO Transportation Study (Nov ‘94)

  • 2020 LRTP MPO Transportation Plan (May ‘96)

  • Williamson Blvd alignment revised to stay west with interchange at Pioneer Trail

  • 2025 LRTP MPO Transportation Plan (Nov ‘05)

Previously Proposed

Williamson Blvd Extension w/ I-95 Interchange

son Blvd

S William

Turnbull Bay Rd

Pioneer Trail

New Interchange Location


I 95 pioneer trail interchange2
I-95/Pioneer Trail Interchange

  • Historical Summary (Continued)

  • FDOT Studies:

  • I-95 Systems Operational Analysis Report - SOAR (Nov ‘05) - Pioneer Trail interchange meets minimum spacing requirements

  • I-95 Sketch Interstate Plan - SIP (Mar 2010) – Pioneer Trail interchange included as “new” designated future roadway project

  • Interchange at I-95/Pioneer Trail not included in LRTP:

  • 2035 MPO Transportation Plan (Sept ‘10)

son Blvd

S Williamson Blvd Extension (Funded for Construction)

S William

Turnbull Bay Rd

Pioneer Trail

New Interchange Location


I 95 pioneer trail interchange3
I-95/Pioneer Trail Interchange

  • Port Orange Comprehensive Plan Historical Summary

  • Initially included in the 1998 Comprehensive Plan Transportation Element – Planned Capital Improvements

  • Retained in the 2010 Comprehensive Plan update


I 95 pioneer trail interchange4
I-95/Pioneer Trail Interchange

Recommendation:

Restore interchange to TPO “unfunded” LRTP allowing it to be evaluated for need & impacts

son Blvd

Williamson Blvd Extension (Funded for Construction)

S William

ETDM

Environmental Screening

New Interchange Location

PD&E

LRTP

Turnbull Bay Rd

IJR

Pioneer Trail


ad