Texas DIAL Project: Emission Measurement Using Differential Absorption Lidar

DESCRIPTION

The TCEQ's DIAL project in Texas aims to evaluate emissions from a bulk storage facility and refinery through Differential Absorption Lidar (DIAL) technology. By comparing DIAL measurements to traditional emission calculations, the project assesses accuracy in detecting volatile organic compounds (VOCs) like benzene. Conducted over the summer of 2007, with a total cost of $650,000 funded by the EPA and TCEQ, the project's final report will be submitted to the EPA post review. Key validation techniques confirm DIAL's reliability in emissions monitoring.

1 / 16

Download Presentation

Texas DIAL Project: Emission Measurement Using Differential Absorption Lidar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Texas Commission on Environmental Quality(TCEQ)Differential Absorbtion Lidar (DIAL) ProjectSummer 2007Texas City, Texas

  2. Project Objective • Compare DIAL measurements with emissions calculated using traditional emission factors and calculation techniques • Measure emission sources located at a bulk storage facility and a refinery in the Houston, Galveston and Brazoria, Texas area

  3. Project Status • Draft DIAL report currently under review by TCEQ - Dec 2007 • After TCEQ review, the report will be sent to project participants for review and comment and then forwarded to EPA - January 2008 • TCEQ’s final report - June 2008

  4. Project Funding • Total project cost $650,000 • $200,000 funded by new technology EPA grant • $450,000 funded by TCEQ

  5. Project Technology • DIAL- Service provided by National Physical Laboratory (NPL) • Hawk Camera - Service provided by Leak Surveys Inc. • UV-DOAS (Ultraviolet-Differential Optical Absorption Spectroscopy) - Provided by EPA • Ambient Sampling- Performed by TCEQ staff and NPL

  6. Bulk Storage Facility Measurements • July 16th to July 20th • 3.5 days of DIAL measurements on naptha tanks with Hawk Camera footage • One night of DIAL measurements on large naptha tank

  7. Bulk Storage Facility Measurements cont. • One large external floater • Tank recently tested and well maintained • Additional wiper seal • Leg supports had fabric covers • Two internal floating roof tanks with hanging roofs

  8. Refinery • July 25th to August 18th • Operated at less than 50% capacity – hurricane damage and turn around projects • Heavily industrialized area around the refinery

  9. Refinery Sources • Fixed roof diesel tanks • External floating roof crude tanks • External floating roof gasoline tanks • Wastewater treatment area including a separator • Heated storage tanks • Three nights of storage tank measurements

  10. Refinery Sources cont. • Coker unit • Total VOC • Benzene- during decoking process • Aromatic Recovery Unit • Sulfur recovery unit • Temporary flare • Large process flare

  11. Coker Unit • Coker Design • 4 product cuts with overhead vapor sent to a vapor recovery unit or into the refinery fuel gas system • DIAL benzene measurements • Measured during decoking process

  12. DIAL Technology Validation Techniques • UV-DOAS measurements closely agreed with DIAL measurements • Canister and tube samples agreed closely with DIAL measurements

  13. DIAL Technology Validation Techniques cont. • Inline gas calibration cells provided by the refinery • Dial measurements very close to actual concentrations for propane, pentane and benzene • Benzene • Actual 1000 ppm • Predicted 900 ± 70 ppm

  14. Questions? • Contact: • Russ Nettles, Team Leader Emissions Assessment Section, Air Quality Division of the TCEQ’s Chief Engineer’s Office • 512 239-1493 • rnettles@tceq.state.tx.us