130 likes | 229 Views
Learn strategies and solutions for implementing an integrated student information system. Discover how to overcome roadblocks and ensure smooth data transition. Get tips for successful system integration and efficient management.
E N D
The Tsunami Effect: Cleaning Up After the Implementation of a New Integrated Student Information System Sam Stigall, MA Bob Lorick, MSMR Terri Day, PhD
Presentation Overview: • Integrated system background • Roadblocks & solutions • Tips
Integrated System Background: • Timeline to rollout: • Rolled out in Summer because of smallest enrollment numbers • Hardest term to calculate because of all the terms: Maymester, 11week and first and second 5 weeks • Sequence of rollout: • Admissions • Financial Aid
Business Practices: • Roadblock: • Departments did not understand what data was collected • Example: Tracking of MA to DOC students not noted in prior system, as students were treated as readmits • Solution: • Academic plans • New process as of Fall 2008
Variable Cleaning: • Roadblock: • Value and variable definition consensus • Solution: • No arbitrary changes can be made without following proper protocol
Student IDs: • Roadblock: • Different IDs for different reporting agencies: • State requires SSN • Institution uses 10 digit ID • Former system assigned a variety of different numbers to international students (created problems with Human Resources) • Internal changes for students without IDs • CBM00N Solution: • Campus-wide agreement on how to use IDs • Ensure new system is integrated with Human Resources
CIP/Academic Plans: • Roadblock: • Mismatches between academic plans and academic classifications that was caused by the creation of new plans: • Example: Materials Science Engineering (MSE) in old system for all levelsNow: MSE_DR, MSE_MENT, MENGR, MSE_METS, MSE_MNR, MSE_MSTH, MSE_SP • Solution: • Simplify academic plans and eliminate redundancy
Majors and Minors: • Roadblock: • Academic plan and classification mismatched due to problems with: • Effective dating • Term activation • Reporting minors as majors • Solution: • Monitor major sequence and language changes • Increase advisor training
Ethnicity and Citizenship: • Roadblock: • New system definitions don’t match UT Arlington’s needs: • New system reports ethnicity and citizenship separately, making it difficult to determine the “international” students • Determining student residency then becomes difficult Solution: • Formed a committee to evaluate the aforementioned issues
Admit Types: • Roadblock: • Graduate school and transfer designation • Undergraduates and EAP • Solution: • Met with respective departments to explain why the logic needed to be simplified
Historical Data: • Roadblock: • Necessity of converting historical records/archives to new system • Fact book: Problems with developing fact book reports • Need to convert expanded variables into old variables for trend analysis and for CB Reporting • Solution: • Hired more reporting individuals • Moved files that may be needed for historical reference to our server
Tips: • Choose the fall semester for system rollout: If your logic is correct, population size doesn’t matter • Pay close attention to what variables are available in the data system • Don’t program around exceptions • You won’t know what data will look like until it’s too late • Running parallel systems • Utilize the system’s audit capabilities • Be cognisant of the marketability of your staff will the new integrated system training • Anticipate Fact book delays
Contact Information: • UT Arlington website: http://www.uta.edu/irp/ • Sam Stigall: • 817-272-3132 • sam@uta.edu • Bob Lorick: • 817-272-5308 • lorick@uta.edu • Terri Day: • 817-272-5130 • terri@uta.edu