Explore the agenda for the EAR2 meeting on September 15, 2011, covering civil engineering, radiation protection, budget planning, staff coordination, and more for the new Experimental Area. Get updates on neutron flux enhancement, simulations, barracks relocation, and cost estimations. Follow the roadmap for project implementation and approvals.
E N D
n_TOF Facility: Experimental Area 2 ( EAR2) E.Chiaveri/ CERN EN-STI-EET EAR2 Meeting 15 September 2011
ITEMS to be discussed EAR2 Meeting 15 September 2011 • Civil Engineering • Radiation Protection • Access • Planning • Budget • Staff • Safety • Next Meeting
NewExperimentalArea (EAR-2) EAR2 ~ 20 m 10 m n_TOF target EAR-1 (at 185 m) Flight-path length : ~20 m at 90° respect to p-beam direction expected neutron flux enhancement drastic reduction of the t0 flash EAR2 Meeting 15 September 2011
Comparison Neutron Fluence EAR1/EAR2 EAR2 Meeting 15 September 2011
Neutron Fluence Comparison to EAR1 Reference for EAR1 : FLUKA Simulations with fission collimator (d = 8 cm) FLUKA Simulation for EAR2
n_TOF barracks TOTEM barracks to be relocated EAR2 Meeting 15 September 2011
FLUKA geometry • 3 D model of the bunker • No penetration (ventilation, detectors or other utilities) ? • Dump 4 cm iron + poly + cadmium + concrete (can be further optimized)
Source term • Neutron spectrum from Christina and Marco (integral = 1.06E07 neutron/cm-2) • Source routine to sample from the energy distribution (normalization to 1 primary…) • Normalization for prompt dose rate calculations : = 1.06x1007 x p x 13/2 x 13/2 x 4 x 1.2 / 16.8 4.02E08 neutrons/s entering the area
Prompt dose rate • Two scenarios : • Full beam goes to the dump (thin samples….) • Thick target inside the bunker scatters the incoming neutrons (detectors, samples for irradiation, flanges….) • Scoring prompt dose rate outside the bunker
What is next ? • Study with updated neutron spectrum (better statistic) and photon spectrum • Define shielding requirements • Integration in ISR area ? Shielding issues ? • Tech. gallery radiation streaming to ISR public area • Integration of requirements for unsealed source handling • Documentation
DRAFT EAR-2 MAD PAD EAR2 Meeting 15 September 2011
Requirements for EAR2 • The Experimental Area on surface must be Work Sector Type A (WSTA) The main requirements with proposed main Actor are: • Drilling of the shaft on top of the Target (~10m) GS • Building on surface (WSTA conditions) GS+DGS/RP • Vertical beam dump (reduced neutron albedo) EN/STI +DGS/RP • Monitored and filtered ventilation (WSTA conditions) EN/CV + DGS/RP • Changing room/Material Entrance (WSTA Conditions)EN/MEF • Monitoring: dose rate, aerosol concentration, hand-foot monitor, portable monitor DGS/RP • Controlled Access integrated in the new PS complex Access System upgrade GS/ASE List not exhaustive. EAR2 Meeting 15 September 2011
Cost estimation for EAR2 • Dismantling barrack 559 • Drilling of the shaft on top of the Target • Construction of the Laboratory (~64m2 WSTA) • Vertical beam dump • Cooling & Ventilation • RP Monitoring • General Services • Contingency List not exhaustive EAR2 Meeting 15 September 2011
Road map • A draft document has been presented to INTC July meeting. • In September/October a final draft including budget, • planning and personnel • A final document will be presented at the end of 2011 • to the Collaboration board • February 2012 final document will be presented to the INTC meeting • March Research Board for final approval EAR2 Meeting 15 September 2011