1 / 17

R L Townsin M R Kattan safinah.co.uk

Antifoulings – Concerns, penalties and remedies especially for the smaller fleet operator October 7-8 - Athens, Greece The third International Symposium on Ship Operations, Management, and Economics. R L Townsin M R Kattan www.safinah.co.uk. Focus of paper. The issues of: Economy

erol
Download Presentation

R L Townsin M R Kattan safinah.co.uk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Antifoulings – Concerns, penalties and remedies especially for the smaller fleet operatorOctober 7-8 - Athens, Greece The third International Symposium on Ship Operations, Management, and Economics R L Townsin M R Kattan www.safinah.co.uk

  2. Focus of paper • The issues of: • Economy • Fuel consumption • And emissions • Are all in large part a product of the performance of the anti-fouling coating. • The intention is to provide some guidance in these matters to the smaller fleet operator

  3. Which AF Product? • The key issue for the owner is one of predictability • However factors such as: • Speed • Activity • Trading pattern • New build production requirements • Dry-dock capability • Must all be taken into account to ensure predictable performance of the AF in service

  4. Hull roughness • At both new build and in dry-dock it is critical to ensure a low hull roughness • This is often compromised by • Cost savings • Poor control of application • Etc.

  5. Predictability • The key elements to predictability, irrespective of the type of anti-fouling technology to be used are: • Operating cost control • Charter party performance • Anti-fouling performance to reduce unscheduled stops/delays (for hull cleaning/dry-docking).

  6. Guarantees • Paint companies often now include guarantees • Fuel savings can be difficult to assign if other factors such as engine overhaul coincide. • What is really responsible for fuel saving or increased fuel consumption can be very dificul t to verify in practice

  7. Development of specification • Key issue is to develop the right specification for your vessel. • Take into account the engineering needs of the coating performance and develop a “functional” paint specification as you would for any other engineering system on board a vessel. • Owner needs to establish a key set of criteria that the paint supplier must prove compliance with.

  8. Measure of success • Enter next dry-dock foul free • Have some reserve AF left • No appreciable roughening of the hull

  9. In service maintenance • This must be planned for hull and propeller. • Speed over performance monitoring should be set up so that hull/propeller performance can be confirmed and action taken as performance falters.

  10. Strategy • A good strategy should have: • Attention to speed, activity levels and trade pattern • Good specification (functional) of anti-fouling system. • Use of a torsion meter to monitor in service performance • Use of Underwater hull cleaning (where possible) as interim solutions if required • Conduct of a well managed dry-docking to minimise hull roughness

  11. Analysis • Considerable work has been done on how to calculate the resultant roughness penalties and key references are given in the paper. • Fouling penalties not so easy to assess but can be derived form speed/power monitoring. • Mini-trials during a voyage can be attempted • On board monitoring systems can be used

  12. Performance data • In the absence of trials, monitoring systems etc and in the event of a dispute then reliance is made on deck and engine logs. • These are not aimed at collecting the data for vessel performance they can provide useful input to any analysis

  13. Data – deck log • GPS position • Time of day • These can be used to calculate • Speed over ground • Ocean current s and winds need to be corrected for to get speed through the water.

  14. Data – ER Log • Fuel consumption often a disappointment • Torsion meter provides most accurate and valuable data (but rarely fitted or used)

  15. Propeller • Largest measuring instrument on board • Use of a power diagram from manufacturer can be used (details are in the written paper submission).

  16. Summary • Guidance on choosing the right AF product • Good practice maintenance advice has been provided • Options for data gathering to allow performance monitoring to be made have been considered • The use of a shaft torsion meter has been advocated.

  17. Safinah LtdIndependent Marine Coating Consultants Providing innovative and cost effective solutions for All marine coating issues enquiries@safinah.co.uk Morpeth, England Tel+44(0)1670519900 www.safinah.co.uk

More Related