Northern Tier Interoperable Project. Planning Progress Report To The NTIC October 14, 2004. PSSB Role In The NTIC. Consulting and Coordination Technical Review Vendor/Contract Assistance Statutory Requirements NTIP Statewide Interoperable Responsibility Public Relations/Information

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Northern Tier Interoperable Project' - ernst


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
northern tier interoperable project

Northern Tier Interoperable Project

Planning Progress Report To The NTIC

October 14, 2004

pssb role in the ntic
PSSB Role In The NTIC
  • Consulting and Coordination
  • Technical Review
  • Vendor/Contract Assistance
  • Statutory Requirements
    • NTIP
    • Statewide Interoperable Responsibility
  • Public Relations/Information
  • Funding
documents currently on pssb web site
Documents Currently on PSSB Web Site
  • NTIP Draft Baseline Design
  • Summary of Collaborative Meeting
  • Baseline System Design
  • Minutes of July 22, 2004

Updates To The NTIP Page Will Be Added On A Regular Basis

Provides mechanism for non-NTIC members to keep informed.

documents available for prior to november meeting
Documents Available For/Prior To November Meeting
  • NTIP Estimated Staffing, Cost Estimates and Implementation Schedule
  • NTIP Recommended Implementation Schedule
  • NTIP Technical Proposal Outline for RFP
  • NTIP Draft Technical Proposal
project management
Project Management
  • The State Proposes Northrop Grumman
    • 50% Time Sr. Project Manager (Mark Adams)
    • 50% Jr. Staff
  • Start date at direction of Consortium
  • Responsibilities: Assist with –
    • Project Implementation
    • Project Coordination (vendor, studies, engineering)
    • Communication
    • Technical Review
draft ntip priority strategy
Draft NTIP Priority Strategy
  • Wide Area Trunked Voice System
  • Interconnect work (SWIP and Counties)
  • Local Area Trunked Voice Systems
  • Local Area Convention Voice Systems
  • P25 Data Systems As Required
  • Dedicated UHF Data System
  • UHF Paging System
questions about maintenance
Questions About Maintenance
  • Who will conduct the maintenance?
  • What will the cost implications be for local agencies?
  • What other options are available?
proposed technical agenda for november meeting
Proposed Technical Agenda For November Meeting
  • Detailed Review of Staffing, Cost Estimates and Implementation Strategy
  • Implementation Recommendations
  • Draft Technical Section