1 / 9

updates

updates. 26 LAV FEE board are ready 7 crates have arrived The TTC & Network fibers installation will finish soon 2 PC were mounted (in a temporary place) The network configuration will be completed next week The 3 additional TALK boards will be ready in two weeks

enan
Download Presentation

updates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. updates • 26 LAV FEE board are ready • 7 crates have arrived • The TTC & Network fibers installation will finish soon • 2 PC were mounted (in a temporary place) • The network configuration will be completed next week • The 3 additional TALK boards will be ready in two weeks • The CHEF board PCBs are in production

  2. Addressing-1 • How to implement the “round robin” mechanism inside the TEL62? How many IPs for data readout we will have this year? • The data request to the SLM should be done at the EOB: is the system (in both side) ready? • The farm could produce, for each burst, a list of the PC actually working? How this list could be transferred and used by the TEL62?

  3. Addressing-2 • Where the “eob summary” should go? In a special PC? Are they treated as standard event (with special trigger word) in a standard PC? Is it possible that the “detectors” participating to the “eob summary” are different with respect to the standard events (i.e. L0TP)? • Could be possible that special events go in special computers? (for instance: monitoring) How this influence the “round robin”?

  4. Event Format • Where the event merging is done? A local PC? In the CC? • We need to order the events inside the burst? • Could the readout program produce a table with timestamp and offset, in order to help the ordering procedure? Other ways? • The format for the “special” (i.e. EOB) trigger will be the same as for standard trigger?

  5. PC Farm • How the PC Farm reads the list of “active” detectors from the Run Control? • Is it possible to run a simple “light” version of the readout program, just to dump the contains of a single packet from a single detector (without event reconstruction, L1, etc etc)? Is it possible to implement a “standalone” mode? • The format of the output is already in the “final” version? • The PC Farm could produce a “eob summary”? Where this information should be stored? In the standard eob summary as additional detector? • Where the “local” switches will be placed?

  6. Online Monitor (a.k.a Event Display) • Where the OM should run? One copy in each PC (or just one single OM)? On the Central Computer? • Which histograms we would like to have in the dry run? And in technical run? • What is present and what is missing in the present NA62 Framework? • Is there any structure to run different “decoding -reconstruction” according to the trigger word? • Is it possible to have additional detectors (L0TP) in the framework?

  7. Service PCs & General • Where the CCPC server will be installed? By whom? Which is the home directory structure? • Where the TTC-Dim interface PC will be installed? Status of HW? SW? • Where the PC for EDA will be installed? • Which OS will be installed on PC farm and service pc? • Who follow the CDR? What are the differences between the present CDR and the NA48 CDR?

  8. Documentation • TALK board? • LAV FEE? • Readout program? • Twiki?

  9. Next meetings • 13 June: TEL62 & TALK firmware: status and interactions • 20 June: Run Control: what we have, what is missing, what we need for the dry run

More Related