An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U.S. Army Corps of EngineersSt. Paul DistrictChannels & Harbors ProjectPresentation for2012 WEDA Midwest ChapterBySteve TappApril 27th, 2012

  2. Upper Mississippi River 9-Foot Navigation System St. Paul District • 13 Locks and Dams • 284 Miles of 9-Foot Channel • Mississippi River • Minnesota River • St. Croix River • Black River • 11 Shallow Draft Recreation Harbors • 3 Shallow Draft Commercial Harbors

  3. St. Paul District Dredging • Average 850,000 CY/YR • Season is May-November • Government & Contract Dredges Used

  4. St. Paul District Dredging Government Equipment • Dredge GOETZ • Replaced THOMPSON in 2005 • 20-inch cutterhead pipeline dredge

  5. St. Paul District Dredging Government Equipment • Dredge DUBUQUE • 12 inch cutterhead pipeline dredge • Excavators • & • Cranes

  6. St. Paul District Dredging Contract Equipment • Hydraulic • Mostly site excavations • Some channel dredging • Mechanical • Mostly channel dredging • 3 year contract with LS Marine in 2011

  7. St. Paul District Dredging 2011 Dredging Summary Total Dredged = 1,478,989 CY Jobs = 54 62% Government 38% Contract Dredge GOETZ Dredging Season 2011: April 27th – November 16th (Last year May 24th – October 13th) Contractor: LS Marine

  8. Upcoming Dredging Jobs 2013: Pool 2 Channel Modification? 500,000 CY 2014: Lost Island Site Unloading (Pool 5) 750,000 CY 2015: McMillan Island Site Unloading (Pool 10) 200,000 CY 2016: Lower Pool 2 Multiple Site Unloading 1,000,000 CY

  9. Capoli Slough Environmental Management Program • Protect 10 Islands • Construct 9 New Islands • Qty Estimates • 250K CY Sand Fill • 35K CY Fines • 30K CY Rock • Award Late 2011

  10. Pool 2 Channel Study • Complete Plan in 2012 • Award Contract in 2013 • Remove .5 Mile of Channel ? • Reduce Dredging • Improve Safety

  11. Thanks!