PACIFIC PROVIDER 2001 AFTER ACTION BRIEF MMF LRG

PACIFIC PROVIDER 2001 AFTER ACTION BRIEF MMF LRG. SITUATION. Mission Statement: CG 3D MAW directed MAG-16/MALS-16 to act as the lead command in planning and executing the biannual T-AVB Activation Exercise for the West Coast.

elsu
Download Presentation

PACIFIC PROVIDER 2001 AFTER ACTION BRIEF MMF LRG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PACIFIC PROVIDER 2001 AFTER ACTION BRIEF MMF LRG

  2. SITUATION Mission Statement: CG 3D MAW directed MAG-16/MALS-16 to act as the lead command in planning and executing the biannual T-AVB Activation Exercise for the West Coast. MALS-16 established a composite MALS afloat aboard the SS Curtiss (T-AVB 4) for a period of three weeks providing intermediate level maintenance repair capability in support of MAG-13, MAG-16 and MAG-39 aircraft ashore.

  3. DURATION AND SIZE OF DEPLOYMENT • Deployment commenced on 20 April and ended on 25 May. • 284 Marines embarked aboard the SS Curtiss. • 30 Marines from 1ST FSSG established a Port Operations Group (POG) prior to and at the conclusion of the at sea period of the exercise.

  4. EXECUTION • Focus of training • Pre-deployment training accomplished • Training areas • Core competency/skill training gained

  5. FOCUS OF TRAINING • Validate the T-AVB LOADPLAN for the 1000/5000 series OP PLAN’s. • Validate 5/5 day timeline to decomlex & safely load in operational configuration. • Maximize repair throughput processed afloat in support of MAG-13, MAG-16 & MAG-39 aircraft.

  6. PRE-DEPLOYMENT TRAINING • Importance of Marine know-how ISO future contingency OPLAN mobilizations. • FY00 T-AVB Familiarization & Load Training conducted 10-22 Sept aboard the SS Curtiss. 107 Marines were trained. • FY01 Final Load Training conducted 2-9 March. 56 Marines were trained in multi-boom & day/night load operations.

  7. CORE COMPETENCY TRAINING • Pacific Provider 2001 is a core-level training exercise. • The T-AVB is the primary means for ‘footprint reduction’ ashore for 3D MAW. • Enables 3D MAW MALS(Rein) unique opportunity to deploy aviation logistics capability afloat in other than L-Class .

  8. TRAINING AREAS • Load/Unload SS Curtiss at Port Hueneme, CA. • SS Curtiss MODLOC in vicinity of Camp Pendleton, CA. • Working Port Call 11-13 May at NAS North Island

  9. OPERATIONAL RISK MANAGEMENT • ORM and safety integrated into each phase of the exercise. • ORM analysis validated by CMFP Safety Specialist, Mr. Don Weightman. • ORM specialist CMFP, Mr. Jeff Wilson (GS-12) on site 24 April to 24 May as safety facilitator.

  10. OPERATIONAL RISK MANAGEMENT • Medical Officer & Corpmen were on station. • Safety Observers strategically placed throughout. • Each phase of the load was preceded & ended w/ a safety brief (&/or chalk talk as req’d). • Working plan disseminated ‘in-hand’ to key reps during (de)embark.

  11. ADMIN/LOGISTICS • Logistics requirements • Communications • Fiscal

  12. LATERAL SUPPORT • Detachments from 3 separate 3d MAW MALS’s, MALSK and the MWSG were afloat, in conjunction w/ shore sited (in-theater) MALS. • L-Class ship AIMDs at NB San Diego. • Reserve Cargo Handling Battalion (CHB) augments.

  13. LOG/TRANS REQs • 1ST FSSG Transportation Support Battalion functioned as Port Ops Group (POG) at Port Hueneme & supplied MHE not organic to SS Curtiss. • TOP via commercial buses. • TOT utilized a mix of base motors and contracted commercial trucking.

  14. TECH SUPPORT • Mr Paul Cerkez, DCS Corp TALPS • Chief Mate Pete Clarke, SS Curtiss • Boatswain Charles Bowen, SS Curtiss

  15. FORCE PROTECTION • Force protection plan developed with guidance from the I MEF Force Protection Officer • Force protection provided by organic personnel w/ T/O weapons onboard (M16’s and 9mm) • 8 Crew served weapons (.50 cals) were provided by MWSS 374 to repel small craft

  16. COMMUNICATIONS • INMARSAT B voice & data connectivity High speed data transfer capability(-). • Internal & limited external e-mail capability. • NIPRNET capability via NCTAMS, Wahiawa, HI. • MWSS 374 Comm det onboard.

  17. STANDDOWN • MALS-16 programmed reduced operating status from 20 to 30 April & 20 to 29 May. • MALS-16(Rein(-)) supported 55 customer a/c deployed to various field sites in SOCAL iat MCAS based a/c. • MAG 16 CO monthly sqdn cmdrs maint. meeting, “customers throughout process noticed no degradation in service.”

  18. STATISTICS Maintenance: Units Inducted RFI BCM MALS-16 1044 905 67 MALS-13 26 14 3 MALS-39 231 62 4 MCC-3 70 37 0 Totals 1371 1018 74

  19. STATISTICS Maintenance: RFI Rate 93% Avg Turn around Time = 3 Days EXREPS Inducted 54 RFI 44 BCM 10

  20. STATISTICS MARLOGS/LOG RUNS: A/C Types CH-53/46,UH-1 Verep Sorties 34 w/ 21.4 Hrs Landings 183 Cargo Transported 46,050 Lbs PAX Transported 46 USN LCU Unrep Several MRBs Ground Trans Camp Pen/NAS

  21. FISCAL • TOT/TOP Costs 176k • TAD Costs 28k • Contract Support Costs 8k • General Supply Costs 12k • Medical Costs 6k • Subsistence 107k • Comm Costs 30k • Total 367k

  22. AFTER ACTIONSITEMS • Complete AA Report to 3 MAW 1 July 01 • Hold sequence diagram = MMF Ser # floor plan, POG seq, prep inst, pwr req’s • TBA incorp into TALPS, ease (ex)import • TALPS output to database/spreadsheet = EXCEL/ACCESS

  23. AFTER ACTIONSITEMS • Standardized Exercise~ By OPLAN • Add NAVAID ISO Flt Ops • Add ‘Mike-Boat’ type of launch for self supported Unrep log runs ICO IFR or sea state.