Procedure for Experiments @ 12 GeV

Procedure for Experiments @ 12 GeV. READINESS REVIEW PROCESS. Jefferson Lab is revisiting the experimental readiness review process in preparation of the 12-GeV startup. That means: Partly correcting the Experiment Readiness Review web pages

elsie
Download Presentation

Procedure for Experiments @ 12 GeV

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Procedure for Experiments @ 12 GeV

  2. READINESS REVIEW PROCESS • Jefferson Lab is revisiting the experimental readiness review process in preparation of the 12-GeV startup. • That means: • Partly correcting the Experiment Readiness Review web pages • Folding in feedback from the management self-assessment for "Installation of New Equipment Involving Multiple Groups” • The document, expected to be released soon, will give the guidance for running experiments in the 12 GeV era.

  3. READINESS REVIEW PROCESS - FLOWCHART • Submitting Proposals PAC&TAC • Director’s Decision PROPOSAL PHASE  PRELIMINARY PLANNING PHASE • Exp. Description and Requirements • Exp. Readiness Review Calendar  • PESAD, specific equipment reviews • Complete Conceptual Designs & “1st” Readiness Review DESIGN PHASE  • Fabrication of the equipment • Test of the individual elements of the equipment (OSP/TOSP) CONSTRUCTION PHASE • Construction near-completed, designs frozen • Exp. Operation Envelop (EOE) • “2nd” Readiness Review before scheduling request submission SCHEDULING OF EXPERIMENT by JLab • “Final” readiness review • Final ESAD & RSAD • COO • Safety Checklist • Experimental Procedures DECOMMISSIONING  EQUIPMENT INSTALLATION RUN THE EXPERIMENT

  4. By the Spokespersons

  5. By the DSO

  6. Ex. DVCS Exp. X X X

  7. Ex. Tritium Exp. Tritium Target X X X