1 / 25

Store MRR

Store MRR. Planned Flow of the Software # 005 = Main Store. File # 005 Covers the next cell of this flow chart. Sub-Topics Covered. Main Stores inward “Entry Starts now”. Select the Inventory Module. System automatically shows the Pending Gate Entries for which MRR is not yet made.

elsie
Download Presentation

Store MRR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Store MRR Planned Flow of the Software # 005 = Main Store

  2. File # 005 Covers the next cell of this flow chart

  3. Sub-Topics Covered

  4. Main Stores inward “Entry Starts now”

  5. Select the Inventory Module

  6. System automatically shows the Pending Gate Entries for which MRR is not yet made

  7. System filled almost all the fields automatically from the Gate Entry Now, store person only needs to confirmed the actual quantity In the Grid 2

  8. Put reel wise Kraft paper Stock Your “Reel number” comes automatically

  9. Each reel’s • Size • GSM • Weight

  10. Landed cost of each ( in Rs / Kgs )

  11. Here is the slot for entry of the “Mill Reel number” Helps in “Traceability” … who made this ?

  12. Any Moisture or Cut mark In this reel Do this reel wise……….. Perfect !

  13. Check total weight and total reel count in Grid 1 and Grid 2 By click on “Check Data in Grid” Button and Press Save

  14. As additional control MRR system asks you to fill the required fields Like • Excise Doc. Received or not • Test Certificate Received or not • Condition of Goods

  15. As additional control MRR system asks “Premium Freight had to be paid ? For this shipment ? “

  16. Questions Value • Any need of Rate in the MRR ? NO • Any need of Value in the MRR ? NO • So, remove the rate and value in MRR = Yes Other Points • Highlight the “shortage” = YES

  17. Going to QC • Print MRR before QC ? • Recommendation by Finsys = YES • Print first, QC does in ERP as well as on the paper + signs it

  18. Next .

  19. Urgent Quality Analysis Required

  20. Line Ruke wali hai, jaldi QC ok karo bhai Such alert goes out to all QC members Direct on their screens

  21. Thank You • Finsys Team

More Related