1 / 6

Update on EVAP Task Force Recommendations for Carbon Canister Aging and Calibration Requirements

The report discusses alternative equations for variable volume SHED, guidelines for carbon canister aging, calibration requirements, and clarification on EVAP family criteria. Changes aim to improve testing procedures and ensure consistency in vehicle emissions testing. Drafting meeting planned for further discussion before submission to GRPE.

elmarrakchi
Download Presentation

Update on EVAP Task Force Recommendations for Carbon Canister Aging and Calibration Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WLTP-24-05e GTR_Amd2 Status report of Evap Task Force Sep., 2018 Mayumi “Sophie” Morimoto (JASIC)

  2. Alternative equation for variable volume SHED 1/4 Alternative equation for variable volume SHED TF member agreed to add alternative equation for variable volume SHED.

  3. Carbon canister aging and it’s installation to vehicle 2/4 • The aged carbon canister shall not be installed during the run-in or before the start of test procedure flow chart. EVAP test start Fuel Drain & Refill Can be installed • The carbon canister aging will need the temperature exposure, vibration exposure and fuel vapour exposure. Soak Not clear the Not clear the aged canister aged canister can/shall be can/shall be installed installed (No determination of BWC300 is required) Preconditioning Canister aging start Fuel Drain & Refill Exposure to temperature Soak Exposure to vibration 2g Break-through Not clear determination of Not clear determination of BWC300 is included in BWC300 is included in making aged canister making aged canister Exposure to fuel vapour Need as Test Procedure Need as Test Procedure Dynamometer test Not required Determination of BWC300 Hot Soak test Clarified texts concerning the aged carbon canister. Diurnal Breathing Loss test

  4. Calibration requirements / EVAP family requirements 3/4 • Calibration requirements and intervals of test equipment • Follow the calibration requirements in referred UNR/GTR • For others, it shall be calibrated before its initial use and at appropriate timing. Clarified calibration requirements • Change/ Clarification of Vehicles considered as same EVAP family • Vapour hose material, fuel line materials and connection technique are not required to be “identical” but “technically equivalent.” (With different hose or line manufacturers, the materials used may be slightly different.) • Only connection technique of fuel line shall be considered in EVAP family. (The pressure inside fuel line is very high that connection technique should be checked to avoid leak. However, the pressure inside the vapour hose is very low and at the instance that it have no chance to leak.) Within stated tolerance Shall be identical Shall be technically equivalent Fuel tank system material and construction Sealed tank or non-sealed tank system BWC and volume of charcoal Vapour hose material, These are separate fuel line material and connection technique Purge control system Fuel tank relief valve setting (air ingestion and relief) Not clear these words are only for fuel Not clear these words are only for fuel line or both vapour hose and fuel line line or both vapour hose and fuel line Will be clarified in final

  5. Conclusions and Schedule 4/4 The discussions on missing equation/contents in GTR 19 are closed. • Add alternative equation for variable volume SHED. • Clarification of text concerning the aged carbon canister. • Add calibration requirements and intervals of test equipment. • Change/clarification of Vehicles considered as same EVAP family Drafting meeting before the working document submission for GRPE is planned on 25thSep. The working document of GTR19 Amd2 will be submitted on 16thOct. • • • 2018 2019 Apr May Jun July Aug Sep Oct … Jan … June GRPE 16 7-8 10-11 #78 GRPE Get approval of GTR 19 Amd2 TODAY Submit WD #76 GRPE GTR 19 Amd1 was approved 17-20 WLTP #22 4-5 WLTP #23 18-21 WLTP #24 IWG Get IWG approval of concept of GTR19 Amd2 8 3 Web Web TF 25 Web Drafting 17 Web 28 Web Would like to ask for approval to these changes by WLTP IWG.

  6. Thank you very much for your attention!

More Related