1 / 28

Welcome to your New HOME

Welcome to your New HOME. Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River.

ella
Download Presentation

Welcome to your New HOME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to your New HOME

  2. Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square meters with 62 percent of the area allotted for roads, landscaped areas and amenities such as playground, swimming pool , and water-featured landscapes. Comprised of 9 buildings ranging from 10 – 14 floors.

  3. LOCATION MAP

  4. LOCATION

  5. LOCATION • Along the historic and scenic banks of Pasig River in Sta. Ana, Manila • Surrounded by the nation’s busiest economic centers of Makati, San Juan, Mandaluyong and Manila • Close to school areas • Accessible to public transportation

  6. SITE DEVELOPMENT

  7. SITE DEVELOPMENT PROPOSED SITE DEVELOPMENT @ REAR PORTION OF YANGTZE BUILDING FRONTING PASIG RIVER

  8. AMENITIES

  9. SITE FEATURES Proposed environment friendly features: • Solar Panel • Rain water catch basin • Waste segregation • Landscaped Park • Pavillion • Water featured landscaping

  10. BUILDING FEATURES • Elevator • 1.5 meter-wide corridors • Roof deck with landing area • Service stairs • Overhead tanks with water pump • Standby generator for common areas

  11. TYPICAL FLOORPLAN

  12. TYPICAL FLOORPLAN

  13. UNIT FINISHES • RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Vinyl Planks Bedrooms Vinyl Planks Toilet Unglazed ceramic tiles Utility Area Plain cement finish B. Wall Finishes No partition walls for bedroom/s Interior walls 1-coat paint on concrete walls Toilet 1-coat plain cement finish above tile

  14. UNIT FINISHES • C. Ceiling Finishes • Living, Dining & Kitchen 1-coat paint on plain cement finish • Bedrooms 1-coat paint on plain cement finish • Toilet 1-coat paint on ficem board finish • D. KitchenKitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included. • E. Door Entrance & • Bedroom door Solid finger jointed wood with sheet • laminated and solid wood core door • jambs plus casing • F. Windows Aluminum windows

  15. UNIT FINISHES G. Finishing Hardware Cylindrical lockset for main Privacy lockset for T & B door. H. Toilet & Kitchen Fixtures Water and Closet Lavatory Complete set of water closet and lavatory with fittings & accessories. Shower faucet Complete set of shower with faucet and fittings. I. Electricity Complete outlet and lighting devices with circuit breaker.

  16. TYPICAL UNIT FLOOR PLAN Provision for 1BR Unit 28.1 sq.m Studio Unit 21.05 sq. m

  17. TYPICAL UNIT FLOOR PLAN Provision for 2BR Unit –B 43.25 sq.m Provision for 2BR Unit – C 44.35 sq.m

  18. AFFORDABILITY • As low as PHP 1.1M for a studio unit • As low as PHP6,000 per month • Flexible payment scheme (down payment – payable up to 24 months; balance – payable up to 30 years through Pag-IBIG) • Available financing through in-house, bank or Pag-IBIG

  19. CERTIFICATE & PERMIT

  20. ConstructionUpdates

  21. COLORADO TOWER HALLWAY BEDROOM

  22. COLORADO TOWER T&B TILING ELEVATOR KITCHEN CABINET

  23. COLORADO TOWER STAIR RAILING TRANSFORMER VAULT ROOM PARKING

  24. COLORADO TOWER PARKING ENTRANCE TRANSFORMER

  25. EUPHRATES TOWER Tiling works at Hallway Painting works on walls & ceiling Installation of Main Doors

  26. EUPHRATES TOWER Tiling works at Hallway Painting works on walls & ceiling Installation of Main Doors

More Related