CERN workshop upgrade Aida Rui De Oliveira. CERN workshop upgrade for MPGD. First step: buy and install 9 machines. The 9 machines are at CERN 6 are installed and commissionned : (large laminator, large oven, photoresist stripping for GEMs, electro-chemical etching line for

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

CERN workshop upgrade Aida Rui De Oliveira


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

CERN workshop upgrade

Aida

Rui De Oliveira

Rui De Oliveira

slide2

CERN workshop upgrade for MPGD

  • First step: buy and install 9 machines.
      • The 9 machines are at CERN
      • 6 are installed and commissionned: (large laminator, large oven,
      • photoresist stripping for GEMs, electro-chemical etching line for
      • GEMs, large UV lamp, Polyimide etching line).
      • 3 are still not installed (photoresist development, Copper etching,
      • photoresist stripping).
      • They will be installed directly into the new building 107
      • This decision does not affect the running R&Ds
  • Second step:
      • -redefine all the process parameter related to the new equipments
      • -Build some prototypes of the # detectors
      • We have built large detectors for CMS , Kloe , Jlab, ATLAS…

Rui De Oliveira

slide3

TE/MPE/EM Workshop upgrade

  • An agreement was reached with CERN management in 2010 to purchase the subset of machines necessary to carry out R&D on large size GEM
  • (2m x 0.5 m) & Micromegas (2m x 1m) and the associated large size
  • read-out boards in the current CERN TE/MPE/ME facility.
  • GEM market call for order received ready
  • survey tender
    • 1 continuous polyimide etcher x x x x 06/2012
    • 1 Cu electroetchline x x x x 06/2012
  • Micromegas
    • 1 large laminator x x x x 06/2011
    • 1 large Cu etcher x x x x postponed
    • 1 large UV exposure unit x x x x 06/2011
    • 1 large resist developer xxx x postponed
    • 1 large resist stripper xx x x postponed
    • 1 large oven x x x x 06/2011
    • 1 large dryer x x x x 06/2011

Rui De Oliveira

3

slide4

UV exposure unit limited to 2m x 0.6m  2.2m x 1.4m

  • Resist developer limited to 0.6m width  1.2m
  • Resist stripper “
  • Copper etcher “
  • Dryer “
  • GEM resist stripping limited to 1m  2m
  • GEM electro etch “
  • GEM polyimide etch limited to 1m  2m
  • Ovens limited to 1.5m x 0.6m  2.2m x 1.4m
  • Laminator limited to 0.6m width  1.2m

Rui De Oliveira

slide5

Ovens limited to 1.5m x 0.6m  2.2m x 1.4m

  • In building 102 .

Rui De Oliveira

slide8

Laminator limited to 0.6m width  1.4m width

  • In building 102 .

Rui De Oliveira

slide9

Resist stripping limited to 1m x 0.5  2m x 1m

  • In building 102 .

Rui De Oliveira

slide10

CMS GE1/1 GEM detector

  • 1m x 50cm
  • 5 detector produced
  • ATLAS MuonsMicromegas detector
  • 1m x 1m active area (1 detector produced)
  • 2m x1m

Rui De Oliveira

slide11

CERN funded the machines. AIDA funded 2 years of a technician(240 kCHF).

  • Julien Burnens, 6 months
  • Michal Zientek, 12 months
  • Looking for somebody for the 6 remainingmonths.