An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liaison Report from 802.18 Date: July 19, 2012 Notice:This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research

  2. Overview • This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the July 2012 IEEE 802 Plenary Meeting held at the Manchester Grand Hyatt, San Diego, CA. John Notor, Notor Research

  3. Comments to M-LMS Build Out Extension Submitted to the FCC • This FCC proceeding sought comments on the requests for extension of construction deadlines to provide commercial M-LMS services in the 900 MHz M-LMS band by Progeny LLC et al. • The comments recommend against extension of the deadlines by the FCC. • This document was reviewed, revised, and approved by 802.18 and has been submitted to the EC for approval. • The document link is:https://mentor.ieee.org/802.18/dcn/12/18-12-0071-01-0000-draft-comments-fcc-wt-12-202-m-lms-buildout-extension.doc John Notor, Notor Research

  4. ITU-R Documents Reviewed and Approved by the RR-TAG • The RR-TAG, working with members of 802.11, created edits to ITU-R M.1801 which updated the material with respect to P802.11, as well as a cover letter. These documents have been sent to the EC for approval. • The edited version of M.1801 is available at this link:https://mentor.ieee.org/802.18/dcn/12/18-12-0063-04-0000-draft-contribution-to-m-1801-revision.docx • The cover letter to ITU-R WP 5A is found at • https://mentor.ieee.org/802.18/dcn/12/18-12-0072-00-0000-draft-cover-letter-m-1801-contribution.doc • The RR-TAG also approved the following documents for submission to ITU-R WP 5D which were created by 802.16: • Draft contrib to ITU-R WP 5D: Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+1) John Notor, Notor Research

  5. ITU-R Documents Reviewed and Approved by the RR-TAG (continued) • The RR-TAG also approved the following created by 802.16 documents for submission to ITU-R WP 5D: • Draft contrib to ITU-R WP 5D: Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+1), which can be found https://mentor.ieee.org/802.18/dcn/12/18-12-0068-03-0000-draft-contrib-to-itu-r-wp-5d-update-of-wirelessman-advanced-rit-of-rec-itu-r-m-2012-meeting-y-1.doc • Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M.1457-11 (Meeting X), which can be found at:https://mentor.ieee.org/802.18/dcn/12/18-12-0070-02-0000-draft-contribution-to-itu-r-wp-5d-update-of-subclause-5-6-of-rec-itu-r-m-1457-11-meeting-x.doc John Notor, Notor Research

  6. ITU-R Documents Which Need Updates from 802 • ITU-R M.1801 needs to be updated with changes for P802.16. • ITU-R M.2116 needs to be updated with changes for P802.16. • ITU-R M.1450 needs to be updated with changes for P802.11. • These documents are scheduled to be updated at the IEEE 802 Wireless Interim Meeting in September 2012 at the Hyatt Grand Champion, Indian Wells, CA, in time for submission to ITU-R WP 5A for their November 2012 meeting. John Notor, Notor Research

  7. ITU-T Documents Which Need Updates from 802 • Access Network Transport Standards Work Plan December 2011 Q 1/15 meeting. • Access Network Transport Standards Overview December 2011 Q 1/15 meeting. • Both documents contain out of date information related to IEEE 802 standards • Example: The work plan still lists Stuart Kerry as Chair of 802.11 • The RR-TAG needs folks to step up and provide the needed edits for their WG. John Notor, Notor Research

  8. Informational Presentations • Richard Kennedy, Research in Motion, presented an overview of a variety of regulatory issues of interest to IEEE 802.Links: https://mentor.ieee.org/802.11/dcn/12/11-12-0868-00-0reg-meeting-plan-and-agenda-san-diego-2012.ppthttps://mentor.ieee.org/802.11/dcn/12/11-12-0956-00-0reg-regulatory-sc-meeting-minutes-july-2012.docx • Jon Adams, Lilee Systems, and Ibrahim Muftic, Parsons-Brinckerhoff, led a discussion of the possibility of using US ITS Spectrum, aka DSRC spectrum, to support Positive Train Control (PTC) systems in the US. The report, 15-12/406r0, has not been uploaded to IEEE Mentor as yet. John Notor, Notor Research