PRODML SIG

PRODML SIG. Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston. General SIG Status. SIG Team Structure. Steering Committee Operations Team Use Case and Marketing Team Co-Chairs: Laurence Ormerod, (open) Specifications and Architecture Team

edward
Download Presentation

PRODML SIG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRODML SIG Team and General SIG MeetingsOctober 13-14, 2009Schlumberger SIS Offices, Houston

  2. General SIG Status

  3. SIG Team Structure • Steering Committee • Operations Team • Use Case and Marketing Team • Co-Chairs: Laurence Ormerod, (open) • Specifications and Architecture Team • Co-Chairs: Bill King and Bill McKenzie • Deployment Support Team • Co-Chairs: Duncan Ord, (open) • Energistics • Alan, Gary, Jana, and Robin [from PDS]

  4. Specifications Team

  5. PRODML Standards: Release Schedule

  6. PRODML Services V2.0

  7. PRODML Implementation Demos The next slide illustrates the Distributed Temperature Survey demonstration. Other current demonstrations are Shell’s automated well test validation demo, Chevron/Moblize’s integrated demo of WITSML and PRODML Standards, and Pioneer’s asset team production monitoring interface demo.

  8. Shell 2009: V2.0 Services, Proof of Concept Distributed Temperature Reconciliation Workflow automation (above) Orchestration (right) Sequence diagram (left)

  9. Gas Lift Design Representative Workflow Laurence Ormerod, Weatherford

  10. Gas Lift Design Process Outline GL Design – uses installed mandrel depths, spec. valves GL Co may specify Valves Installed by slickline. Well operating Installation, with Blank GL mandrels Depth “as installed” Completion Co. Completion Design: tubulars and GL valve depths variables GL Co may advise Drill well: Results inform completion design Valve Design ? Known √ ?