An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work at Height in a Rail Environment Michael Evanson, Construction Manager Birmingham Gateway Project

  2. Introduction • Work-scope • Safe Methods of Working at Height • Consideration of Railway Environment • Working Sub-Surface • Selection of Access Equipment • How to re-evaluate after CHANGE • Design & CDM Create your footer by changing copy in the Header and Footer section

  3. Workscope • De-construction of existing ceiling framework • Adaption of existing M&E high level services • Installation of the new ceiling framework • Installation of new M&E services • Structural Breakthroughs at high level Create your footer by changing copy in the Header and Footer section

  4. Safe Methods of Working at Height • Tube & Fitting Scaffold • Aluminium or GRP Tower • MEWP’s – Scissor Lift and Cherry Picker • Podium Steps • Ladders Create your footer by changing copy in the Header and Footer section

  5. Consideration of Railway Environment • Train Movements, Drivers Perception • Signalling • OHLE • P-Way (Gauging) • Platform Loading (5KN/m2) • Maintenance Colleagues require Access • Designated Fire Escape Routes • Passengers & General Public Create your footer by changing copy in the Header and Footer section

  6. Working Sub-Surface • Restrictions on use and storage of fuels • Restrictions of use and storage of combustible materials • Hot Works & Fire Watcher Create your footer by changing copy in the Header and Footer section

  7. Selection of Access Equipment • Battery Operated Scissor Lifts for Works 1.25m back from platform edge • Battery Operated Cherry Picker for Works within 1.25m of platform edge • GRP Tower for works to M&E on u/s ceiling framework • Tube & Fitting Scaffold for structural breakthroughs (Bonded out) Create your footer by changing copy in the Header and Footer section

  8. Use of a Cherry Picker • Slew Restrictor rather than boom restrictor • Second Man at ground level • Wheel-stop along platform (sleeper) • Hoarding on platform edge • Cease all movements when a train enters the adjacent platform • Site Warden and pedestrian barriers to separate from the rest of the worksite Create your footer by changing copy in the Header and Footer section

  9. Use of a Cherry Picker P1 P2/3 Create your footer by changing copy in the Header and Footer section

  10. Use of a Cherry Picker Create your footer by changing copy in the Header and Footer section

  11. How to Re-evaluate after CHANGE • Consider operated plant, towers and scaffold after the platform line has been handed back into operational use and the OHLE has been re-energised. • Protection of platform surfacing • Transient Worksites and Edge Protection Create your footer by changing copy in the Header and Footer section

  12. Design and CDM • Position of ceiling framework relative to the platform edge • Weight of individual components for manual handling and size of plant • Lengths of components for clashes with the operational infrastructure Create your footer by changing copy in the Header and Footer section

  13. The Next Big Risk – Entrapment Create your footer by changing copy in the Header and Footer section