100 likes | 206 Views
The project proposes a new telecommunications station for General Electric, focusing on sustainability and efficiency. The design aims to serve a primary customer, a telecommunications company, while also benefiting rural citizens near Managua, Nicaragua. By utilizing solar and wind energy, the station aims to operate off-grid with a calculated load of 2094.2 Watts. The total material cost is under $120,000, with an installed cost of $142,548. This station emphasizes environmental sustainability and resilience against weather conditions, reducing reliance on non-renewable energy sources.
E N D
GE DESIGN PROJECT Carrie Weinhold ChidiChukwunenye Jed Gallo Sean Funk
The Objective General Electric is in need of a new design of a telecommunications station powered by sustainable energy and using their new sodium metal halide battery.
The Customer • Main customer: telecommunications company and their biggest need is for an efficient cost-friendly telecommunications center • Secondary Customers: the citizens of rural town outside of Managua, Nicaragua.
Background Information • Exploring alternate energy sources: Wind Solar Geothermal Micro hydro Best two sources: solar and wind
Target Specifications • Materials Cost- under $120,000 • Off- grid powered • Energy input/output- calculated load=2094.2 Watts • Environmental sustainability • Weather resistant • Decrease use of non-renewable energy
Proposed Solutions Solar Diesel Wind Wind Tronics WT6500 Wind Turbine Kubota GL 7000 Diesel Generator GE Energy GEPV-200, Solar Panel, 200 Watt, 24 Volt
Design Solution 72 GE solar panels: 36 pairs in parallel 1 7kW Kubota GL 7000 Diesel Generator
Design Solutions PV ARRAY SIZE: 7.2 kw Generator to Solar Output Generator Info
Cost Analysis Cost of Materials: $114,649.98 Total Cost of Product (installed): $142,548.45