European R equalification System

Emrah T. SAK March 2013. European R equalification System. Today’s Outline. Brief Information About EVAS Periodic Inspection in Europe General Information About Related EN Standards Refurbishment Process. ABOUT EVAS. The first LPG cylinder manufacturer of Turkey .

Download Presentation

European R equalification System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Emrah T. SAK March 2013 European RequalificationSystem

  2. Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe • General Information AboutRelated EN Standards • RefurbishmentProcess

  3. ABOUT EVAS • Thefirst LPG cylindermanufacturer of Turkey. • One of the biggest LPG cylinderproducers in Europe. • SHVENERGYcompany • Annuallyaround 2 million cylindersproduction. • Annuallyaround600.000 cylindersrefurbishment. • Active in 5 Continets, 49 Countriesallaroundthe World

  4. Power to Contain World’s Energy

  5. ABOUT EVAS İstanbul-New Cylinder Manufacturing Ankara-Refurbishment İzmir-Refurbishment

  6. Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe

  7. Periodic Inspection Period Working life of cylinder? There is nocalculated life spanfor LPG cylinders

  8. Periodic Inspection Period • Average life span of cylinders: • InWest Europe 41 years • InTurkey 32 years • InUAE (officially )15 years • InMalesia 11 years Malesia-Cylinder Distribution

  9. EVAS Refurbishment Factories-2012 Number of received cylinders in 2012: 550.000 units Testing without repair: 87.000 units Testing with repair: 326.000 units Scrap: 137.000 units

  10. PRESTAGAZ Statistics-2012 Luxembourgish Company Number of received cylinders in 2012: 680.000 units from 5 countries

  11. Comparison of Turkish and European Data 66% 11% 32 years 41 years 6 times 4 times

  12. Periodic Inspection Period in Europe • NormallyforallcylindersPeriodicInspection Period is 10years. • It can be extendedto15yearsiffollowingsarefulfilled: • Cylinder is be owned by and under the responsibility for checking, filling and maintenance of acompetent gas organisation

  13. Periodic Inspection Period in Europe 11 kg GermandepositCylinder 15 YearsPeriodicInspection 11 kg GermanNutzungCylinder 10 YearsPeriodicInspection

  14. Periodic Inspection Period in Europe • NormallyforallcylindersPeriodicInspection Period is 10years. • It can be extendedto15yearsiffollowingsarefulfilled: • Cylinder is be owned by and under the responsibility for checking, filling and maintenance of acompetent gas organisation • there must be an external protection against corrosion • Cylinder should be filled in accordance withEN 1439

  15. Today’s Outline • Brief Information AboutEVAS • PeriodicInspectionin Europe • General Information AboutRelated EN Standards

  16. European Norms EN 1439 - LPG equipment and accessories. Procedure for checking LPG cylinders before, during and after filling EN 1440 - LPG equipment and accessories. Periodic inspection of transportable refillable LPG cylinders EN 14912 - LPG equipment and accessories - Inspection and maintenanceof LPG cylinder valves at time of periodic inspection of cylinders

  17. EN 1439 SCOPE Covers the control operations applied on transportable, refillable LPG cyliders before, during and after filling. EN 1439

  18. EN 1439 Segregation of Cylinders before Filling

  19. EN 1439 Defects for Rejection

  20. EN 1439 Defects for Rejection

  21. EN 1439 Defects for Rejection

  22. EN 1439 Controls During the Filling

  23. EN 1439 Post Filling Controls

  24. EN 1440 SCOPE Covers the periodic inspection and tests on transportable, refillable LPG cylinders. Periodic inspections/tests shall be carried out by a competent person under the control of aninspection body based on a written scheme and in accordance with the procedures. It also consists general frame of repair and it is requirements.

  25. EN 1440 Procedures for periodic inspection

  26. Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe • General Information AboutRelated EN Standards • RefurbishmentProcess

  27. Refurbishment Before-After

  28. Refurbishment Process in EVAS

  29. Refurbishment De-Gasing & Valve Removing EX-ZONE Detection of liquid gas2 Gamma radiation sources which detect up to 400 gr gas left in the cylinders. Drain and gas recoveryEmptying bottles and recovering the gas-in the gas phase or liquid.The recovered gas is stored and re-used. No atmospheric emissions! Valve removing All valves removed are stored and inspected later according EN14912 standard or as per customer specs

  30. Refurbishment Washing & Visual Inspection Visual Inspection Then cylinders are visually inspected and separated either for repairing or scraping, or conform ones, send to the finishing hall. Inspection is realized by qualified and trained personnel. Internal WashingEvery cylinder is internaly washed in automatic carousel

  31. Refurbishment Washing & Visual Inspection Straighten of Foot-Ring and/or Collar Changing of Foot-ring or Valve Guard Separated Damaged Cylinder

  32. Refurbishment De-Denting Blowing Damaged cylinders are de-dented by means of pressured air and heating of dent zone.

  33. Refurbishment Heat Treatment (stress relieving) at 600-630 oC Hydrostatic Testing Shot Blasting

  34. Refurbishment Finishing Zinc Coating • Recording • Retest date, • Manufacture date • Manufacturer’s name Painting

  35. Refurbishment Finishing Inkjet Marking Printing all information regarding tare weight, test date and next retest date on the cylinders. It allows much more legibility and visibility of all essential information. Valve Fitting Leakage Test

  36. Refurbishment Before-After

  37. No Repairable Cylinders Bulge Depresed Bung Lamination Cut (which exceeds min. thickness) Depresed Shroud or Foot-ring

  38. Refurbishment Scrapping Smashed Cylinders

  39. AIPGL Mexico City-2013 THANK YOU!