1 / 26

Recent and planed NCEP climate modeling activities

Recent and planed NCEP climate modeling activities. Hua-Lu Pan EMC/NCEP. EMC is considering the following upgrades to the operational CFS Reducing the 8-lag in the initial condition to a 1-day lag.

dunn
Download Presentation

Recent and planed NCEP climate modeling activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent and planed NCEP climate modeling activities Hua-Lu Pan EMC/NCEP

  2. EMC is considering the following upgrades to the operational CFS • Reducing the 8-lag in the initial condition to a 1-day lag. • Introducing 2 new members at higher resolution (T126L64) out to 60 days only. These 2 members would initiate from the same initial condition as the operational two T62L64 members. • Both these upgrades would aim to improve upon the week 3-6 / monthly forecast leads.

  3. NAO – PNA SKILL CFS Operational T62L64 Forecasts MAR2005 – FEB2007 2 IC at Day 1-7 of each of the 24 months Forecast lead times 1-45 days

  4. Negative skewness in observations

  5. Daily skill scoresAveraged over 14 forecasts per monthafter forecast lead time of 8 days

  6. Studies to prepare for a monthly forecast suite (week3 to week6) • Four-times daily T126 version of the CFS, • Runs are made to 60 days in length, • Daily runs of the hindcasts, • The test period is 2000-2004. • The period of the runs are : 7 May – 15 July and 7 Nov – 15 Jan.

  7. Daily

  8. Month-1 Correlation Scores NAO 33.0 % PNA 21.3 %

  9. Impact of Coupling

  10. Pattern correlation for 2000-2004 Summer 0.6 0.4 Persistence Winter 0.6 0.4 Persistence

  11. Pattern Correlation for initialization dates from May to June 2002 The Predictability Barrier June 6th-9th June 6th-9th June 6th-9th 6-9 June: MJO maximum activity crosses “the Maritime Continent”

  12. March 2005 – Feb 2007 Week 1 Week 2 Week 3 Week 4 Monthly Longitude

  13. March 2005 – Feb 2007 0.55 = mean ac of daily forecasts in week 1 range Week 1 Week 2 Week 3 Week 4 Monthly Initial Month

  14. Design of the 30-year NCEP CFSRR T382L64 Global Reanalysis and T126L64 Seasonal Reforecast Project(1979-2008) Suru Saha and Hua-Lu Pan, EMC/NCEP With Input from Stephen Lord, Mark Iredell, Shrinivas Moorthi, David Behringer, Ken Mitchell, Bob Kistler, Huug van den Dool and others

  15. NCEP CFSRR SLIDE - 1 4 Simultaneous Streams • Jan 1978 – Sep 1987 9 years • Oct 1985 – Sep 1994 9 years • Oct 1992 – Sep 2001 9 years • Oct 1999 – Sep 2008 9 years 2-year overlap for ocean and land spin ups Total of 36 years of Reanalysis

  16. NCEP CFSRR SLIDE - 3 ONE DAY OF REANALYSIS • Atmospheric T382L64 (GSI) Analysis at 0,6,12 and 18Z • Ocean and Sea Ice Analysis (GODAS) at 0,6,12 and 18Z • From each of the 4 cycles, a 9-hour coupled guess forecast (GFS at T382L64) is made with hourly coupling to the ocean (MOM4 at 1/4o equatorial, 1/2o global) • Land (GLDAS) Analysis with Noah at 0Z • Coupled 2-day forecast from initial conditions from every cycle, or coupled 5-day forecast from every 0Z cycle (starting every year from 1 Jan 00Z) is made with the T382L64 GFS with hourly coupling to the ocean (MOM4 at 1/4o equatorial, 1/2o global) for sanity check.

  17. NCEP CFSRR SLIDE - 4 CFS REFORECASTS 1 Jan 0Z 2 Jan 6Z 3 Jan 12Z 4 Jan 18Z 6 Jan 0Z 1 year T126L64 coupled forecast ( GFS + MOM4 + Noah ) Coupled one-year forecast from initial conditions 30 hours apart is made for 2 initial months (April and October) with the T126L64 GFS with hourly coupling to the ocean (MOM4 at 1/4o equatorial, 1/2o global). Total number of forecasts = 28 x 2 x 30 = 1680 For each cycle, there will be approximately 7 members per month, with a total of 210 members over a 30-year period. This ensures stable calibration for forecasts originating from each cycle, for a given initial month

  18. NCEP CFSRR SLIDE - 5 CFS REFORECASTS Example : Skill Estimation for the Initial Month of February In real time operational prediction, the latest members would be used. For instance, the earliest forecasts release for CPC would be the 15th of the month. Therefore, all members up to the 9th of the month would be used since operations would run in near real time. For skill estimation, the following 16 members would be used for February starts (going backwards) : Feb 8 18z, Feb 7 12z, Feb 6 06z, Feb 5 00z, Feb 3 18z……Jan 21 00z This includes 4 days of 4 different cycles (Jan 21 0z – Feb 8 18z), smoothly separated by 30 hours. This is in contrast to the present system, where we use 15 members from Jan 9 00z – Feb 3 00z, in 5-day chunks.

More Related