An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team GR8!!! Nathan Cantrell James Jones Jacob Smith Anna Tourville

  2. Team Gr8!!

  3. Introduction • The overall goal of the project was to make a working Rube Goldberg that could be triggered by another team and trigger the next team • The parts of our device were found in the Estabrook workshop and at Wal-Mart • The overall estimated cost of the project was ≈$20

  4. Team Gr8 Project Overview • The first step of the device was to trigger a small mousetrap to pull a string and make marbles go down a pvc track. • The next step was for the marbles to hit domino’s, striking a toy car and dropping it. • The toy car acts as a counterweight and triggers a track that makes another car go. • The car goes around a track and launches through a funnel and onto a teeter totter. • The teeter totter drops and triggers an ipod and the next project.

  5. The “Goldberg”

  6. Physics Principles Used in the device • Torque-mousetrap • Collision-dominos • Gravitational Potential Energy-car dropping • Trajectory-car launching • Conservation of Energy-car dropping on teeter totter

  7. Conclusion • The project took close to 10 hours time to complete and was worked on by all team members as often as possible • Problems -trying to get the dominos to start a car -team moral ran rather low(food fixed this problem) -placement of the mousetrap -launch/land position of the car Through sheer ingenuity we battled through all problems and stuck together as a team.