An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALD work status and next planNov-23-2010 Anil Mane, Qing Peng, Jeff Elam ALD Research Program, Process Technology Research Group Energy Systems Division.

  2. ALD work current status: • Two 33mm MCPs to Prof. Ossy (10/22/10) • Working MCPs (4) to Matt and presented data and testing continue • Processed 3x 33mm AAO MCPs with active area of ~1.5cm2 20µm pores form Hau • Prior to ALD coating 2 MCP has cracked and chip off • These MCPs are very fragile and got random crack during handling but active area is good • Sent for electrode coating at Fermi lab • Demonstrated 8”x8” Grid spacer coating by ALD with appropriate resistance (3M) • Demonstrated first time 8”x8” MCP coating by ANL ALD group • Processed with ALD resistive chemistry (1 ,2) and SEE ( 1, 2) • MCP sent to Prof. Ossy for electrode deposition, gain test and many more test…. • Note: these MCPs has cracked prior to deposition (during shipping from Incom to ANL)

  3. ALD Plan-1: Goal: • Mock tile we need following items to prepare: (Target date = Feb/11) • 4x pairs of 33mm MCPs with same resistance (ALD chemistry -2) • 2 pair will have MgO and other 2 pairs will have ALO SEE layer • 3x  8”x8” grid spacers coating • Resistance of grid will be depend on the MCP resistance and current flowing through circuit • 2x “George space” glass pate with 4x 33 mm holes • 10x higher resistance than MCP for charge dissipation • Ship mock tile to Prof. Ossy for testing • 2x pairs (4x  33mm MCPs) with same chemistry to Matt RGeorge >>RMCP

  4. Resistance calculations for one section: The resistance calculation will based on MCP resistance

  5. ALD Plan-2: Goal: To study simulation vs. experimental data comparison (Target date: Mid Dec/10) • 3x 33mm MCPs to Matt gain test: • Half resistive-only, half 2 nm MgO • Half resistive-only, half 20 nm MgO • Half resistive-only, half 20 nm Al2O3 • Coupons to Slade for SEE measurements: • Only resistive • 2nm MgO on resistive • 20 nm MgO on resistive • 20 nm Al2O3 on resistive • Both gain and SEE data will supply to Zeke, Valentin for simulation Resistive Layer Resistive Layer + SEE SEE layer Resistive layer Resistive layer Substrate Substrate

  6. Near term requirements: • Good 33mm MCPs (Received 11/22/10) • Good 8”x8” MCPs • Good 8”x8” Grids • Good 8”x8” George Spacers • For better electrical data: • 8”x8” MCP holder for electrode (design is given to Fermi lab) • 8”x8” Grid holder for electrode (Al plate with grid impression grove)

  7. 8”x8” Grid holder for electrode Grove in Al plate as per 8”x8” Grid dimension Push rods/screws To hold the MCP 8.5”x8.5”x10mm Al plate

  8. 8”x8” Grid holder for electrode

  9. 8”x8” Grid holder for electrode

  10. 8”x8” Grid holder for electrode Evaporation source