1 / 23

Using EPS to assess downstream uncertain-ties when TC´s occuring - An example.

Using EPS to assess downstream uncertain-ties when TC´s occuring - An example. Outlines:. In which way can we use EPS to obtain a qualitative impression of the uncertainties regarding TC´s and their extratropical stage?

dom
Download Presentation

Using EPS to assess downstream uncertain-ties when TC´s occuring - An example.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Using EPS to assess downstream uncertain-ties when TC´s occuring - An example.

  2. Outlines: • In which way can we use EPS to obtain a qualitative impression of the uncertainties regarding TC´s and their extratropical stage? • Can this aid us in early decision making when we know the operation criteria limits? • Can this give example give an approach towards a more generel methodology?

  3. Tropical Cyclone impact on scores

  4. Container vessel Marchen Maersk sailed from Los Angeles to Yokohama 2009 October 7th-21th:

  5. 1) Avoid Heavy Weather Damage:2) Most economic route3) Fastest route Limit of sig. waves for this voyage about 6m. Fin stabilizer Missing Fin stabilizers Millions of USD lost…

  6. Weather routeing request: • Requested service: Weather routeing • Company name: A.P.Møller Mærsk • Ship name: Marchen Mærsk • Imo no: 9359014 • Call sign: OUIY2 • Inmarsat no: +870 763 747 691 • E_mail ship: mbxmarchen@maersk.com • Dept port: Los Angeles • Dept country: USA • Etd date (utc): 06.Oct.2009. • Etd hour (utc): 2359 • Arr port: Yokohama • Arr country: Japan • Eta date(utc): 21.Oct.2009. • Eta hour(utc): 1600 • Service/eco speed: Service speed is 25kn • Gmt: 3m Expected • Displacement: 101000mt • Fin Stabilizer yes/no: No • Remarks/requirements: I expect to run with required speed in order to be • as economical as possible.

  7. Routes: RL=5030nm GC=4750nm GC via Bering Sea (Unimak Passage/Attu Island)=4850nm

  8. TC activity enroute: 1) Typhoon ”Melor” (a reality by time of departure) 2) Possible developments east of the Philippines

  9. 1st advice (6/10): GC via Unimak passage to north of Attu Island for Yokohama. • Motivation: Passing safe north of ”Melor” the 12th and later getting mainly north of the lowtrack. • Synopsis main feature: …”Typhoon ”Melor” was the 6th/06:00 located at 23.9n/130.9e and is currently moving n-wards about 15kt, later ne- to e-wards becoming extratropical during the 9th th and most likely taking a track along 48-50n without causing you troubles..”

  10. Iteration 7th/00z +24hr = 8th/00z +48hr = 09/00z +72hr = 10/00z +96hr = 11/00z

  11. Daily evaluation of the forecasts • Checking significant changes in the forecasts from day to day • Forecasts from the 8th almost similar to the ones from the 7th, except for…: • A tropical depression is detected east of the Philippines

  12. New ”Dangerous” forecast valid 15th/12z!! Deterministic run based on Iteration 9th/00z

  13. EPS – Significant wave – Valid 15/12:00Z Forecast base time 9th/00z 35-65% Example (95-100%) +6m

  14. Recently detected TD 23w (Oct 8th), later TS ”Nepartak”, viewed in ECMWF´s ”Strike Probability Map” October 9th/00z

  15. Preliminary route alternate: Dangerous area 15th of oct. Deviation point 51n/150w Vessel pos 9th of oct. +6m (35-65%)

  16. 2nd advice (9/10): Now GC via 51n/150w, thence until further GC south of the Aleutians via 50n/175e for Yokohama. • Motivation: Waiting until apprx. 150w (11th/AM where the situation hopefully has become less unsettled, then probably deviating just south of the Aleutians due to a long-term forecasted, northgoing strong gale- or storm low just south Kamchatka during the 14-15th – with risk of + 6m seas. • Synopsis main feature: ..” Former typhoon "Melor” became officially declared extratropical the 09/06:00 at 44n/150e and now continues e- to ene-wards along 49-50n - forecasted the 12th/12:00 near 50n/157w and just after passing south of you. Revert- ing with further details about the possible strong low south of Kamchatka in our next update, by the latest October the 12th.

  17. Ex-”Melor” Ex-”Melor” Iteration 9th/00 +24hr = 12/00z +48rs = 13/00z l +108hr = 15/12z +72hr = 14/00z

  18. ECMWF Cyclone Tracker / SPM starting up when a TD is detected. Nepartak 9th-11th:

  19. Wave Epsgram from Oct 10th/00z EPS members suggest more northerly track

  20. ”Nepartak” life cycle October 8th-14th close to the 11th/00z iteration TD ”23W” first detected 8th/12:00 Upgraded to TS ”Nepartak” the 9th

  21. Surface map the 15th/12:00 – iteration 11th/00z far better than the 9th/00z run

  22. 3rd advice (11/10): Now proceed GC via Unimak passage to north of Attu Island for Yokohama. • Motivation: • The recent uncertainties regarding seas about 6m via Unimak-Attu route, caused by tropical cyclone activity south of Japan (Nepartak), has now reduced significantly and it seems quite confident that "Nepartak" will pass safe south of the vessel. • Synopsis main feature: ..” Former typhoon "Melor", now an ordinary extratropical low near 49n/162w continues e- later- ese-wards, passing just south of you the 12th/AM, while ene-going (ex-) ”Nepartak" passes well south of you along 42-45n the 15th/PM (please note that there is a still risk of a slight more northerly track)”..

  23. Summary: • In which way can we use EPS to obtain a qualitative impression of the uncertainties regarding TC´s and their extratropical stage? Compare various plots of EPS including spatial- and time related aspects of the development. • Can this aid us in early decision making, when we know the operation criteria limits? Setting up a specific deadline to take action in order for a given parameter not to be exceeded or event to take place (binary=yes/no) will help us doing this (for exampletake action when probability > 35% after T+xx hrs) • Can this give example give an approach towards a more generel methodology? Any parameter can be involved, for example temp>30 deg, 10m winds>25 m/s, precipitation>20mm/6hrs. Knowledge about the models ability to predict the phenonomen must be known.

More Related