An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assessor’s office SPACE: OVERVIEW & PLAN Lisle Township

  2. Background How did we get here?

  3. Problem • In 2015, mold was discovered in the Assessor’s office at 4721 Indiana Ave. • A contractor was hired to remediate the mold. • Following remediation, an environmental assessment was done on the office building. • Mold remained / resurfaced • The building should not be inhabited • The Assessor’s staff immediately moved to other space.

  4. Timeline

  5. Timeline, continued

  6. Path Forward What do we do now?

  7. Path Forward – January 2018 • Conduct a Geotechnical Analysis to identify the maximum capacity of the foundation/structure. • Township Board will discuss and agree upon all feasible options for permanent office space for the Assessor and staff. • Initiate public outreach at Annual Meeting • Conduct public outreach meetings in a focus group format to inform the public and receive feedback on the options. • The Township Board will review the feedback from the public meetings and develop a prioritized set of recommendations of the options. • Develop high-level implementation plans for the prioritized options. • Conduct a Special Meeting of Electors to select the option for implementation. • Implement the plan for the selected option.

  8. Possible Options • Demolish entire structure; design and construct full new office building • Demolish structure, while keeping foundation; design and construct new office building on existing foundation. • Demolish portions of structure, while keeping foundation and basic shell of the building; design and construct office using foundation and shell. • Continue to rent at an off-property location; demolish existing building • Purchase alternative site (if existing site identified); demolish existing building • Rent until alternative site presents itself (below a pre-determined value), then purchase alternative site; demolish existing building

  9. Option 1: Demolish & rebuild new Advantages Disadvantages • Building will be suited for the Assessor’s current and future needs. • Stronger, more efficient structure can be designed & built. • Can design to accommodate other Township needs. • Lowest long-term operational costs, if maintained appropriately • On Township property, adjacent to other Departments. • Provides permanent location for office for staff and residents • No off-site purchase of real estate, which removes an office building from the tax base • Most expensive option ($2 - $2.6 Million) • Most extensive coordination and permitting needed • If Township government undergoes significant change or consolidation, then return on investment not realized by the Township

  10. Option 2: Demolish & rebuild on existing foundation Advantages Disadvantages • Building will be suited for the Assessor’s current and some future needs. • Stronger, more efficient structure can be designed & built. • Lowest long-term operational costs, if maintained appropriately • On Township property, adjacent to other Departments. • Provides permanent location for office for staff and residents • No off-site purchase of real estate, which removes an office building from the tax base • High cost ($1.7 - $2.1 Million) • If Township government undergoes significant change or consolidation, then return on investment not realized by the Township • Will be contained to the existing footprint

  11. Option 3: Demolish Portions & Rebuild on Existing Foundation and Structural Steel Advantages Disadvantages • Building will be suited for the Assessor’s current and some future needs. • Stronger, more efficient structure can be designed & built. • Lowest long-term operational costs, if maintained appropriately • On Township property, adjacent to other Departments. • Provides permanent location for office for staff and residents • No off-site purchase of real estate, which removes an office building from the tax base • Moderate to High Cost ($1.4 – 1.8 Million) • If Township government undergoes significant change or consolidation, then return on investment not realized by the Township • Will be contained to the existing footprint

  12. Option 4: Continue to Rent Off-site Space, Demo Existing Building Advantages Disadvantages • Low-cost solution (current rent is ~$52,000 / year) • Provides flexibility to relocate if needs change, and more permanence than current situation. • Remove hazard of existing building • Avoids major expenditure during uncertainty of future of Township government. • Current site becomes usable space for future needs. • Locates Assessor separate from other Departments • Minimal impact on operations • Residents who visit multiple departments may need to make 2 trips.

  13. Option 5: Purchase Alternative Site, Demo Existing Building Advantages Disadvantages • Provides permanent location for office for staff and residents • Remove hazard of existing building • Current site becomes usable space for future needs. • Moderate Cost ($700k - $1.2 Million) • Locates Assessor separate from other Departments • Minimal impact on operations • Residents who visit multiple departments may need to make 2 trips. • Governmental purchase of real estate removes an office building from the tax base

  14. Option 6: Rent until Alt. Site Found, Purchase Alt. Site, Demo Existing Building Advantages Disadvantages • Use low-cost solution until most cost-effective site found • Provides flexibility to relocate until site found, and more permanence than current situation. • Remove hazard of existing building. • Delays major expenditure during uncertainty of future of Township government. • Current site becomes usable space for future needs. • Moderate Cost ($700k - $1.2 Million) • Locates Assessor separate from other Departments • Minimal impact on operations • Residents who visit multiple departments may need to make 2 trips. • Governmental purchase of real estate removes an office building from the tax base

  15. We Want Your Feedback! Questions Focus Groups Board Meetings Special Meeting