450 likes | 617 Views
Security Tradeoffs in NEST Dec 16, 2003. C. M. Krishna, I. Koren, A. Ganz, C. Andras Moritz (presenter) University of Massachusetts, Amherst K. G. Shin University of Michigan Y.-H. Lee Arizona State University. Administrative. Project Title: Security Tradeoffs in NEST
E N D
Security Tradeoffs in NESTDec 16, 2003 C. M. Krishna, I. Koren, A. Ganz, C. Andras Moritz (presenter) University of Massachusetts, Amherst K. G. Shin University of Michigan Y.-H. Lee Arizona State University
Administrative • Project Title: Security Tradeoffs in NEST • Program Manager: Vijay Raghavan • PI Name(s): C. M. Krishna, Y.-H. Lee, K. G. Shin, A. Ganz, I. Koren, and C.A. Moritz • PI Phone Number(s): (413) 545-0766 • PI E-Mail Address(es): krishna@ecs.umass.edu • Company/Institution: Univ of Massachusetts at Amherst, Univ of Michigan, Arizona State University • Contract Number: F33615-02-C-4031 • Award Start Date: 9/9/2002 • Award End Date: 9/9/2004 • Agent Name/Organization: Juan Carbonell, Wright-Patterson Air Force Base.
Subcontractors and Collaborators • Subcontractors • University of Michigan • Arizona State University • Collaborators • University of Virginia • BBN • UC Berkeley • SRI
PI Name Affiliation Security Tradeoffs in NESTUniversity of Massachusetts; University of Michigan; Arizona State University Problem and Challenge New Ideas System Constraints Application Needs Security Requirements • Adapting security level of each task to application requirements and system constraints. • Security broker to select the appropriate security protocol. • Fault-tolerance and performance integrated with security • SERVICES • Security Broker • Power Management • Failure Handling • Intrusion Detection • Other Services • Allocation • Scheduling • Routing • …. Middleware TinyOS Impact Schedule • Ensures appropriate levels of security for application needs. • Integrates security with performance, reliability, power requirements and constraints. • Enables dynamic adjustments as needs and resource availability change. • Q4FY03 • Encryption mechanisms • Incorporating fault-tolerance • Intrusion detection • Secured wireless protocol • Q2FY04 - Security Broker • Q2FY04- IV Manager • Q3FY04 - Software prototype • Q4FY04 - Experimentation & validation
Problem Description/Objective • NEST needs an integrated framework for a secure, resource-constrained system • To preserve resources, it needs to dynamically determine appropriate security actions, given • Application assurance requirements • System state and configuration • Operating environment (such as benign or hostile) • Our project will enable NEST to • Ensure appropriate security levels • Integrate security with performance, power, and reliability • Permit dynamic adjustments as needs/resources change
Key Project Directions • Manage Security Actions/Levels – Security Broker • Coarse-grained: Pre-deployed security services • Fine-grained: embedded Initialization Vector (IV) Manager • Manage Key Updates • Lightweight Security Protocol (LiSP) • Provide Reliable Security • Detect if faults are injected or naturally present • Security- and Power-Aware Routing/Transmission • Adapt routing by adjusting transmission range/power
Presentation Outline • Brief Overview of Techniques Implemented • Update on Security Broker • Security service composition • Embedded IV Manager • Application: “Waking Up Big Brother” • Project Status, Success Criteria, Plans, Schedule, Milestones, Technology Transfer
Presentation Outline • Brief Overview of Techniques Implemented • Update on Security Broker • Security service composition • Embedded IV Manager • Application: “Waking Up Big Brother” • Project Status, Success Criteria, Plans, Schedule, Milestones, Technology Transfer
Lightweight Security Protocol (LiSP) Motivation: • Periodic key updates are necessary • Frequent key exchange, retransmissions (due to unreliable media) and acknowledgements consume significant power Solution: • Provide lightweight key update (to maximize sensor lifetime) by exploiting information redundancy in key sequences Summary Results: • Implicit authentication for new keys, easy recovery of keys, no retransmissions • Resource consumption relatively low: less than 3 hash computations even when more than 40% of the temporary keys are compromised or lost.
Fault Detection Motivation: • Faults compromise security: may be maliciously injected by an attacker to probe the system and extract the secret key • Faults should be detected to avoid transmission of erroneous messages Solution: • Check-bit prediction developed for RC5, AES • Detect faults to block output of erroneous results Summary Results: • All single bit failures detected • Most of the multiple faults detected with the 4-bit parity and Residue-15 codes – percentage undetected faults less than 1%
Transmission Scheme Tradeoffs Motivation: • Radio communication is very energy-intensive • If multi-hop forwarding is used, nodes close to the base station can rapidly deplete their batteries; reaching directly to BS requires high transmission power • The network lifetime limited by the nodes with maximum power consumption Solution: • Move hotspot from innermost annulus • Probabilistic traffic balancing • Forward packets with probability • Transmit packets directly (high power) to the BS with probability Summary: • Approach prolongs sensor network lifetime (power saving depends on size of network, maximum range, density)
Presentation Outline • Brief Overview of Techniques Implemented • Update on Security Broker • Security service composition • Embedded IV Manager • Application: “Waking Up Big Brother” • Project Status, Success Criteria, Plans, Schedule, Milestones, Technology Transfer
Security Broker Motivation: • Different applications require different security services • Different environments (external/internal) require different levels of security provision • Resource-limited devices cannot afford to overprovision • No one-size-fits-all solution exists Objective: Maximize sensor lifetime by providing applications “just enough” security protection
application comp message active message Radio Packet packet Service Library Security Broker Cipher Library Radio byte byte RFM bit Approach • Pre-deploy security components at the link layer • Runtime service composition • aspects of security concerns (e.g., integrity, confidentiality, replay attacks) • levels of security provision (e.g., encryption algorithm, # rounds, block size) • react adaptively (external/internal requirements)
Block size/2 Block size/2 2 1 1 Bytes 2 Mandatory fields for all services Optional fields based on service composition Bits CRC MAC IV dest AM* length Data Packet Format – Security Encoding • “X1” and “X2”, is used to represent the strength of the cipher used. Security Composition ID (SCID) • “C” = Confidentiality • “I” = Integrity • “S” = Semantic security with implicit counter • “R” = Replay protection • “0000”, then no security service is provided
Systems Packet sizes Energy consumption Broker CISR=0000 14 bytes 229,600 nJ CISR=1000 14 bytes 242,380 nJ (31.4%) CISR=0100 16 bytes 275,180 nJ (22.2%) CISR=1100 16 bytes 287,960 nJ (18.6%) CISR=1111 20 bytes 353,560 nJ TinySec 20 bytes 353,560 nJ TinyOS 16 bytes 262,400 nJ Energy Comparison • SenseToRfm application with 8 byte payload • Picking a lower level of security can significantly prolong the network lifetime • 31.4% savings for Confidentiality only (CISR=1000) • 22.2% savings for Integrity only (CISR=0100) • 18.6% saving for Confidentiality and Integrity (CISR=1100)
Embedded IV Manager Part of Security Broker Motivation: • Semantic security and defense against replay attacks often requires using an Initialization Vector (IV) with every packet • IVs consume a substantial amount of bandwidth (bits transmitted) • Most power is consumed during communication, thus IVs increase power consumption significantly Objective: • Maximize sensor lifetime by providing applications “embedded” (vs. explicit) semantic security protection
How does it work? • Setup IV once per session • Embed IV in the encryption of checksum after setup • No explicit IV is sent • IV is calculated from the checksum at the receiver • Receiver uses difference between its expected IV and received IV to accept or reject packets • To counter packet loss and out of order packets • Allow outstanding IVs, but only within a predefined window • Two consecutive IVs ahead of window indicate synchronization loss and trigger resetting IV at the receiver (to next expected IV)
H M EK2(H | EK1,IV) Encrypt with K3 IV EK2(H | EK1,IV)IV H EK1,IV(M) C C=EK3 (EK2(H | EK1,IV)IV) At the Sender EK1,IV(M)
Checksum EK3 (EK2(H | EK1)IV) Header H Ciphertext EK1,IV(M) Decrypt with K3 Calculate EK2(H | EK1)IV H EK1,IV(M) C EK2(H | EK1 ) IV can be calculated from checksum This is IV used by sender! IV At the Receiver
Results and Benefits • Trades transmission power with computation • 23% energy reduction possible
Demonstration • We add security services to the “Waking Up Big Brother” application • Developed by J. Stankovic, T. Abdelzaher (Virginia) and B. Krogh (CMU), et al • Application is based on ad-hoc sensor network that tracks intruders in a field and wakes up SOCOM sensor (“Big Brother”) • A sentry-based aggressive power management scheme is used: only “sentry” motes are awake, other motes are in sleep mode to preserve battery power • Our contributions: • Incorporate security services • Show defense against various security attacks • Show security - resource consumption tradeoffs • Port application to TinyOS 1.1
Presentation Outline • Brief Overview of Techniques Implemented • Update on Security Broker • Coarse-grained services • Fine-grained: embedded IV Manager • Application: “Waking Up Big Brother” • Project Status, Success Criteria, Plans, Schedule, Milestones, Technology Transfer
Project Status • We are currently on target on milestones proposed • Initial version of Security Broker • LiSP demonstrated • Fault detection in encryption completed • Integration of security services into “Waking Up Big Brother” application started • Simulation-level integration working • Demonstration on motes with all middleware security techniques is work in progress
Goals and Success Criteria • Goals • Ensure appropriate security levels and prolong sensor network lifetime • Integrate security with performance, power, and reliability • Success criteria • Software prototype (security services) integrated and demonstrated with one application • Security capabilities for various attack scenarios and power saving demonstrated
Selected Recent Publications Taejoon Park and Kang G. Shin, ``LiSP: A Lightweight Security Protocol forwireless sensor networks,'' ACM Transactions on Embedded Computer Systems (in press) G. Bertoni, L. Breveglieri, I. Koren, P. Maistri and V. Piuri,``Detecting and Locating Faults in VLSI Implementations of the AdvancedEncryption Standard," Proc. of the 2003 IEEEInternational Symposium on Defect and Fault Tolerance in VLSI Systems,pp. 105-113, November 2003. Q. Xue, A. Ganz, "Runtime Security Composition for Sensor Networks(SecureSense)", Vehicular Technology Conference, Orlando, FL, October2003. Q. Xue, A. Ganz, "Adaptive Mesh Routing in Mesh Wireless LANs",Vehicular Technology Conference, Orlando, FL, October 2003. G. Bertoni, L. Breveglieri, I. Koren, P. Maistri and V. Piuri,``Concurrent Fault Detection in a Hardware Implementation of the RC5Encryption Algorithm," Proc. of ASAP'03 - the Internl. Conferenceon Application-Specific Systems, Architectures and Processors,pp. 423-432, June 2003.G. Bertoni, L. Breveglieri, I. Koren, P. Maistri and V. Piuri, ``Error Analysis and Detection Procedures for a Hardware Implementationof the Advanced Encryption Standard," IEEE Trans. on Computers, Special Issue on Cryptographic Hardware and Embedded Systems, pp. 492-505, April 2003.
Project Plans • Demonstrate security services in the “Waking Up Big Brother” application • Performance goals • Provide “just enough” security to reduce power consumption • Up to 35% energy saving depending on security attack, channel noise, and application • How progress will be measured • Energy security tradeoffs evaluated • Energy reduction for various scenarios evaluated • Software prototype of application with security middleware (TinyOS 1.1, Mica 2) deployed
Project Milestones • Key 3 tasks remaining: • Security Broker integrated with IV Manager (Q3FY04) • Integration with the LISP lightweight key exchange (Q3FY04) • Incorporate security services into the “Waking Up Big Brother” application (Q4FY04) • Demonstration event (Q4FY04) • Security middleware software prototype incorporated into the “Waking Up Big Brother” application • Resource consumption tradeoffs and security services demonstrated
Overall Project Schedule • Q1FY03 Evaluation of Encryption Techniques • Q4FY03 Incorporating fault-tolerance • Q4FY03 Lightweight security protocol • Q3FY04 Security Broker with other Integrated Middleware Techniques • Q3FY04 Software prototype • Q4FY04 Experimentation & validation
Technology Transfer • CASA Engineering Research Center • Collaborative multi-University effort led by UMass ECE department • Intelligent network of radars and sensors – targeting severe weather prediction and tracking • Longer term use of information includes: air traffic controllers, civil defense • Security aspect is critical
Program Issues • Quality of hardware platform • Development tools
How does it work? • Temporal keys (TKs) and refresh interval sent to sensors for encrypting/decrypting data • TKs distributed well before their use • Sensors buffer sequence and generate TKs using a cryptographic one-way function TKi = H(TKi+1)
TK Management Steps at Sensors buffer • Receive a TK (way ahead of its use) • Verify authenticity • Buffer TKk if correct • Recover missing TK from later TK with help of hash function • Rekey after half the refresh interval to next TK
Summary of LiSP • Resource consumption relatively low: less than 3 hash computations even when more than 40% of the TKs are compromised or lost. • No retransmissions or acknowledgements • Implicit authentication for new keys • Easy recovery of lost keys • Tolerance to clock skews allows us to refresh keys on a slightly non-periodic basis
Transmission Cost/Tradeoffs • Possible approaches to deliver information: • Reach directly to BS if in range using • High-power consumed per transmission Transmission power (Pt) law: • a,b are constants; α is related to attenuation; r is range • Power is increasing exponentially with range • Multi-hop forwarding • Total transmission energy declines (due to exponentially lower power cost for shorter transmissions) • Channel congestion decreases (due to shorter range) • But, nodes in the inner annuli consume battery fast!
Devised Transmission Schemes • P-hybrid – probabilistic traffic balancing (assume within range) • Move the hot spot from the inner-most Annulus • Forward packets with probability • Transmit packets directly to the BS with probability: • T-hybrid – combine P-hybrid with threshold • Transmit first to cells within range • Use P-hybrid within range • Evaluation is ongoing work
Fault Detection for RC5 • We have focused on four detection techniques: Type of EDC # of redundant bits Redundancy Word parity 1 3% Byte parity 4 12.5% Residue 3 2 6.25% Residue 15 4 12.5% • Check-bit prediction schemes were developed for all four techniques • All single bit failures were detected by all four schemes
Multiple Fault Coverage • Summary: The 4-bit parity and Residue-15 codes achieve the highest coverage of multiple faulty bits – percentage undetected faults less than 1% in most cases