DECISION TREE. Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach Dr.Prasanta Kumar Dey. CONTENT. What is the decision tree? The example of decision tree The advantage of decision tree The application of decision tree. WHAT IS THE DECISION TREE?.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

DECISION TREE


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. DECISION TREE Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach Dr.Prasanta Kumar Dey

    2. CONTENT • What is the decision tree? • The example of decision tree • The advantage of decision tree • The application of decision tree

    3. WHAT IS THE DECISION TREE? • Decision tree is a decision support tool that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility. • Decision tree is commonly used in operations research, specifically in decision analysis, to help identify a strategy most likely to reach a goal. • Another use of decision trees is as a descriptive means for calculating conditional probabilities.

    4. THE EXAMPLE OF DECISION TREE

    5. THE ADVANTAGE OF DECISION TREE • Are simple to understand and interpret.  • Have value even with little hard data.  • Use a white box model.  • Can be combined with other decision techniques. 

    6. Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach Dr.Prasanta Kumar Dey

    7. CONVENTIONAL PROJECT MANAGEMENT MODEL

    8. PROPOSED PROJECT MODEL

    9. RISK MANAGEMENT PROCESS • Risk identification • Risk analysis • Risk response

    10. RISK MANAGEMENT FLOW

    11. METHODOLOGY • Identifying the work packages for risk analysis. • Identifying the factors that affect the time, cost, and quality achievement of a specific work package. • Analysis the effect and determining severity of failure • Driving various alternatives responses for mitigating the effect of risk factors. • Estimating cost for each alternative • Determining the probability and severity of failure of a specific work package • Forming a decision tree. • Deriving expected monetary value or the cost of risk response in this case. • Selecting the best option statistical analysis.

    12. IDENTIFICATION OF WORK PACKAGES • Riving crossing • Pipeline laying • Stations construction • Telecommunication and SCADA system

    13. WORK BREAKDOWN STRUCTURE

    14. AHP MODEL FOR DETERMINING RISKING OF PROJECT

    15. IDENTIFICATION OF RISK FACTORS • Technical Risk • scope change • technology selections • implementation methodology selection • Equipment risk • materials risk • Engineering and design change • Acts of God • normal natural calamities • abnormal natural calamities

    16. Financial, Economical and Political Risk • inflation risk • fund risk • changes of local law • changes in government policy • improper estimation • Organization Risk • capability risk of owner’s project group • contractors failure • vendor’s failure • consultant’s failure

    17. Statutory Clearance Risk • environmental clearance • land acquisition • clearance from chief controller of explosives • other clearance from government authorities

    18. LIKELIHOOD OF RISK IN A PROJECT

    19. PROBABILITY AND SEVERITY OF RISK FACTORS

    20. DECISION ALTERNATIVES • do nothing • carrying out detailed survey • using superior technology • engaging an expert project team • taking all responses

    21. THE COST DATA FOR EACH PACKAGE AGAINST VARIOUS RESPONSES

    22. DECISION TREE FOR PIPELINE LAYING WORK PACKAGE

    23. DECISION TREE FOR RIVER CROSSING WORK PACKAGE

    24. DECISION TREE FOR STATION CONSTRUCTION WORK PACKAGE

    25. DECISION TREE FOR TELECOMMUNICATION AND CATHODIC PROTECTION WORK PACKAGE

    26. THE EMV FOR “ PIPELINE LAYING PROJECT”

    27. THE EMV FOR” PIPELINE LAYING ACROSS RIVER”

    28. THE EMV FOR ” STATION CONSTRUCTION”

    29. THE EMV FOR “TELECOMMUNTION AND SCADA SYSTEM

    30. THE DECISION EMERGE

    31. RISK RESPONSES • To avoid • To reduce • To transfer • To absorb

    32. CONCLUSION • Risk management using a combined AHP and DTA provides an effective means for managing a complex project efficiently. • Risk management makes an effect to quantify risk by modeling its probability and severity in line with the perceptions of experienced project executives subjectivity.

    33. REFERENCE • http://en.wikipedia.org/wiki/Decision_tree • http://www.mindtools.com/dectree.html • http://zh.wikipedia.org/zh-hk/%E5%86%B3%E7%AD%96%E6%A0%91