3. November 2005, Bergamo. The SEAPLANE Project. Activity 3 Airport passenger market analysis Realisation of suggested Routes Further opportunities for airports. Dr Benedikt Mandel MKmetric Gesellschaft für Systemplanung mbH, Karlsruhe. info@mkm.de. Tasks.

demetria
Download Presentation

The SEAPLANE Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3. November 2005, Bergamo The SEAPLANE Project Activity 3 Airport passenger market analysis Realisation of suggested Routes Further opportunities for airports Dr Benedikt Mandel MKmetric Gesellschaft für Systemplanung mbH, Karlsruhe info@mkm.de

  2. Tasks • Establishing the simulation framework • Ex post Simulation of air passenger market potential - Computation- Analysis- Reference year 2000 • Ex ante Simulation of air passenger market potential - Computation- Analysis- Forecast horizon 2006 • Development of an Action Plan for inauguration of flights MKmetric November 2005

  3. Input • Socio-economy data (e.g. population, economic structure) • Consideration of urbanisation and land use, infrastructure and motorization • Consideration of political constraints and transport policy in all countries • Consideration of competing transport modes in all countries • Data on the NUTS 3 level for EU and according to the distance from EU with growing country agglomerations MKmetric November 2005

  4. Methodology Socio- economy Ground-basedTransport Travel Surveys TransportPolicy Reference Status System Approach - Generation - Distribution - Modal Split - Route choice - Assignment Statistics, link counts Matrix Bounding Ex post Ex ante Workshop input, report & action Plan Commercial viable routes MKmetric November 2005

  5. Logit i, jCn Point elasticity Cross elasticity Methodology MKmetric October 2005

  6. Specific assumptions • Set up of scenario definitions for ex ante analysis (forecast)socio-economy, according to workshop and regional partners infrastructure update to 2004 including indications of regional partnersnetwork assumptions according to schedule summer 2004 ex VXO-CPH  regionalisation incl. update for UK and split up of Møre og Romsdal area • Forecast is for 2006 (perspective for inauguration of new routes) • Economic limitations for inaugurating a new routeannual demand > 50 tsd. “weighted” passengers (5000 for charter) business pax are counted twice, transfer pax count 50% when travelling for private reasons for charter and low cost flights no transfer passengers are counted  for charter flights no business travellers are counted no double count for business travellers on low cost flights MKmetric November 2005

  7. Output I • Airports: Oostende - OST, BE Hannover - HAJ, DE Bremen - BRE, DE Groningen - GRQ, NL Aalesund - AES, NO  Kristiansand - KRS, NO  Stavanger - SVG, NO Inverness - INV, UK  Kristianstad - KID, SE  Växjö - VXO, SE • Time horizon - Scenario: Ex post - 2000 Ex ante - 2006 • Promotion: European Commission Workshop •  Via partner regions and partner airports • Action plan: Content - airport, region, routes Lay out - two pages per route MKmetric November 2005

  8. Output II Analysis by airport: total number of passengers p.a., conditional aircraft movements, catchment and traffic information, technical and commercial key figures. Analysis by route: new routes, total number of passengers p.a., structure of the demand, type and structure of service, catchment and sheaf of the route, market penetration figures. Analysis by region: socio-economic data in total and relative to the catchment, changes in accessibility by air transport, transport key figures. MKmetric November 2005

  9. Improvement of Accessibility by new Routes ____________________________________________________________________________________ MKmetric GmbH November 2005

  10. Action Plans • description of the airport and the region incl. status quo catchment with socio-economic data • for each feasible new route total demand by business / leisure, O&D / transfer passengers route sheaf for transfer passengers  route specific catchment  suggestions for aircraft / airline / schedule summary of relevant technical aspects • demand forecast for the airport incl. the new routes • key figures concerning additional passenger & a/c mileage, fuel consumption, passenger hours saved • improvement of accessibility ____________________________________________________________________________________ MKmetric GmbH November 2005

  11. Action Plan Improvement • The Action Plans were presented at the Hannover workshop in 2004. • The Action Plan issued for Hannover airport has been used as material for the latest ROUTES conference. A review meeting at Hannover will take place in 11/2005 • Numerous routes suggested within the project have been set into service. • Various responses to the Action Plans lead to an improvement of this form of presenting results, enriched with additional information, to be used within the forthcoming EUROPLANE project, now called Implementation Folder ____________________________________________________________________________________ MKmetric GmbH November 2005

  12. New Routes inaugurated  1 year ago, more than 90 routes were identified for 2006, 22 of them are or will be in service already 2005: MKmetric November 2005

  13. 8 New Routes Inverness MKmetric November 2005

  14. 5 New Routes Hannover MKmetric November 2005

  15. 5 New Routes Scandinavia MKmetric November 2005

  16. 4 New Routes other MKmetric November 2005

  17. Results for Bremen ____________________________________________________________________________________ MKmetric GmbH November 2005

  18. Consultation in Bremen  From 13 suggested routes just 1 is for scheduled service, while all other focus on holiday destinations.  Only 1 of the suggested holiday routes was implemented. In addition the tour operator owing Hapagfly, home base charter carrier at BRE, reorganised its network, meaning a serious reduction of holiday destinations ex BRE in 2006 (and from other airports in .de although high loads)  network carrier reduced their presence at Bremen (outsourcing of hub connections, or give up routes)  new answers have to be found to such challenges:* development of options for new or modified services MKmetric November 2005

  19. Further Options for Routes  Implementation of suggested routes by LCC instead of charter or network carrier, with or without a variation of suggested airport: The suggested flights HAJ - RJK for charter, are actually run by Hapag-Lloyd Express (with medium sized a/c, up to 3 times a week)  New LC services to additional airports in cities already connected to a SEAPLANE airport ,like the new flights from Bremen to London Luton by easyJet  Implementation or take over of existing routes by low cost or regional carrier instead of network or charter carrier, with or without code-share / interlining tariffs, ...  New routes beyond given limit (50’000 pax) with small a/c  ... MKmetric November 2005

  20. Thank you for your attention. MKmetric November 2005