An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RRD STATION AMENITY PROGRAM R7 – CHESTNUT HILL EAST STATIONS DRAWING LIST 60245 C1 COVER SHEET 60246 C2 GENERAL NOTES & SCHEDULE 60247 A1 CHESTNUT HILL EAST SITE PLAN 60248 A2 CHE PAINTING AND IMPROVEMENT DETAILS 60249 A3 GRAVERS SITE PLAN 60250 A4 GRAVERS PAINTING AND IMPROVEMENT DETAILS 60251 A5 WYNDMOOR SITE PLAN 60252 A6 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60253 A7 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60254 A8 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60255 A9 MT. AIRY SITE PLAN 60256 A10 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60257 A11 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60258 A12 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60259 A13 SEDGWICK SITE PLAN 60260 A14 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60261 A15 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60262 A16 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60263 A17 STENTON SITE PLAN 60264 A18 STENTON PAINTING AND IMPROVEMENT DETAILS 60265 A19 STENTON PAINTING AND IMPROVEMENT DETAILS 60266 A20 WASHINGTON LANE SITE PLAN 60267 A21 WASHINGTON LANEPAINTING AND IMPROVEMENT DETAILS 60268 A22 WASHINGTON LANEPAINTING AND IMPROVEMENT DETAILS 60269 D1 RAILING DETAILS 60270 D2 SIGN DETAILS 60271 D3 FURNISHINGS DETAILS 60272 SH1 SHELTER NOTES 60273 SH2 SHELTER DETAILS 60274 SH3 SHELTER DETAILS 60275 SH4 SHELTER DETAILS PROJECT LOCATIONS WORK ORDER NO. SCALE:_________________ DATE:_____________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM COVER SHEET CHIEF ENGINEER PROJECT ARCHITECT DRAWING C1 OF 2 SHEET NO. 1 OF 31 DIRECTOR OF ENGINEERING DRAWING NO. 60245 SYSTEM SAFETY REV REV DATE DESCRIPTION BY OK’D AP’D

  2. SEDGWICK SCOPE • INBOUND SIDE • REPLACE SHELTER WITH NEW SHELTER • INSTALL FIVE PLATFORM MOUNTED SIGNS • REPLACE SIDEWALK • INSTALL 2 BICYCLE RACKS • PAINT STAIR HANDRAIL • REPLACE SIDEWALK ALONG DEVON STREET (APPROX 500 SQFT • OUTBOUND SIDE AND BRIDGE • PAINT STAIR HANDRAIL • INSTALL FIVE PLATFORM MOUNTED SIGNS • REMOVE STUMPS • REPAIR CURB (APPROX 100 LF.) • PAINT BRIDGE OVER E. MT PLEASANT AVENUE • REPAIR SIDEWALK ALONG E. MT PLEASANT AVE. (APPROX 500 SQFT) REPLACE APPROXIMATELY 200SQFT OF SIDEWALK BETWEEN HERE AND THE BRIDGE PAINT DECORATIVE METAL SECTION (EM) GRIND STUMPS TO BELOW GRADE, COVER WITH TOPSOIL AND SEED PAINT STAIR HANDRAILS (EM) PATCH LANDINGS AND TREADS (TYP FOR ALL OF BOTH STAIRS PAINT ENTIRE ABANDONED STAIR HEADHOUSE (ES) REPAIR AND PAINT DECORATIVE IRON FENCE TO ADJACENT BRIDGE (APPROX 450’) REPLACE CONCRETE WALK SECTION AND PATCH STAIRS PAINT HANDRAILS AND SUPPORTS (EM) PAINT OUTER BRIDGE GIRDERS INCLUDING OUTER FACE AND TOP, SIDE AND BOTTOM EDGES PER SPEC SECTION INSTALL PLATFORM MOUNTED ID SIGNS (2 THIS SIDE) REPLACE RAILING WITH STANDARD GUARDRAIL INSTALL END OF PLATFORM SIGN ON FENCE INSTALL END OF PLATFORM FENCE & SIGN EXTEND PLATFORM 24” AND INSTALL NEWSPAPER CORRAL REMOVE EXISTING HANDRAIL REPLACE HANDRAIL INSTALL 2 SHELTERS REPAIR CORNERS OF BRIDGE ABUTMENTS INSTALL PLATFORM MOUNTED ID SIGNS (3 THIS SIDE) REMOVE EXISTING SHELTER INSTALL 3 STAIR HANDRAILS REMOVE SECTION OF HEDGE AND INSTALL CONCRETE WALK SPECIAL NOTE FOR REPAIR OF BRIDGE ABUTMENTS: A LICENSED ENGINEER MUST DESIGN AND SEAL ALL BRIDGE ABUTMENT REPAIRS. ALL REPAIRS MUST BE EXECUTED UNDER THE ENGINEER’S SUPERVISION. PAINT HANDRAILS AND SUPPORTS (EM) REPLACE SIDEWALK SEDGWICK STATION NOT TO SCALE WORK ORDER NO. SCALE:_________________ DATE:_____2/13/09________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM SEDGWICK ARCHITECTURAL SITE PLAN CHIEF ENGINEER PROJECT ARCHITECT DRAWING A13 OF A22 SHEET NO. 15 OF 31 DIRECTOR OF ENGINEERING DRAWING NO. 60259 SYSTEM SAFETY REV REV DATE DESCRIPTION BY OK’D AP’D

  3. PAINT PREPARATION AND SYSTEMS EGM- EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14 2 COATS HIGH SOLIDS POLYURETHANE B65-300 EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600 2 COATS HIGH SOLIDS POLYURETHANE B65-300 ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY: 1 COAT PREPRITE 200 PRIMER B28W200 2 COATS A100 EXTERIOR LATEX SEMI-GLOSS REPLACE SHELTER WITH NEW SHELTER REPLACE SIDEWALK ENTIRE LENGTH PAINT METAL RAILING AND POSTS (EM) INBOUND SIDE INBOUND END OUTBOUND SIDE INBOUND END AT STREET ON INBOUND SIDE OUTBOUND END REMOVE AND REPLACE WITH STANDARD GUARDRAIL PAINT OUTER GIRDERS OF BRIDGE GRIND STUMPS TO GROUND LEVEL PAINT BRIDGE ABUTMENTS (ES) REMOVE VEGETATION PAINT METAL STAIR RAILING (EM) PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE OUTBOUND END OUTBOUND SIDE INBOUND END OUTBOUND SIDE OUTBOUND END PAINT DECORATIVE FENCE (EM) REMOVE POST & FILL HOLES IN CONCRETE PAINT RAILING (EM) PAINT METAL RAILING AND POSTS PATCH VOIDS AND PAINT (ES) PATCH CONCRETE INSTALL THREE PLATFORM MOUNTED SIGNS & FRAMES EACH SIDE OUTBOUND END OUTBOUND SIDE OUTBOUND END STAIRS AT OUTBOUND SIDE OUTBOUND END WORK ORDER NO. SCALE:_________________ DATE:_____2/13/09________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM SEDGWICK ARCHITECTURAL PAINTING AND IMPROVEMENT DETAILS CHIEF ENGINEER PROJECT ARCHITECT DRAWING A14 OF A22 SHEET NO. 16 OF 31 DIRECTOR OF ENGINEERING DRAWING NO. 60260 SYSTEM SAFETY REV REV DATE DESCRIPTION BY OK’D AP’D

  4. PAINT PREPARATION AND SYSTEMS EGM- EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14 2 COATS HIGH SOLIDS POLYURETHANE B65-300 EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600 2 COATS HIGH SOLIDS POLYURETHANE B65-300 ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY: 1 COAT PREPRITE 200 PRIMER B28W200 2 COATS A100 EXTERIOR LATEX SEMI-GLOSS PAINT RAILING (EM) PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE REMOVE BUSHES AND INSTALL 5’-0” WIDE CONCRETE PATH CONNECTION PARKING WITH WALKWAY REPLACE MISSING CONCRETE AT STAIR AT OB SIDE/OB END STAIRS AT OUTBOUND SIDE OUTBOUND END OUTBOUND SIDE OUTBOUND END INSTALL GUARDRAIL WITH END OF PLATFORM SIGN FRAME REMOVE SIGN REPLACE W/ SEPTA GUARDRAIL & INTEGRAL END OF PLATFORM SIGN REPLACE RAILING WITH STANDARD GUARDRAIL SAWCUT SLAB AND REPLACE LANDING ON STAIR AT IB END OF OB SIDE. ATTACH EXISTING RAILING TO NEW GUARDRAIL STAIRS AT OUTBOUND SIDE INBOUND END OUTBOUND SIDE INBOUND END STAIRS AT OUTBOUND SIDE INBOUND END PAINT OUTER BRIDGE GIRDERS PAINT OUTER BRIDGE GIRDERS PAINT OUTER BRIDGE GIRDERS REMOVE VEGETATION REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN BRIDGE ABUTMENT ACROSS STREET INBOOUND END BRIDGE ABUTMENT ACROSS STREET INBOOUND END E INBOUND END WORK ORDER NO. SCALE:_________________ DATE:_____2/13/09________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM SEDGWICK ARCHITECTURAL PAINTING AND IMPROVEMENT DETAILS CHIEF ENGINEER PROJECT ARCHITECT DRAWING A15 OF A22 SHEET NO. 17 OF 31 DIRECTOR OF ENGINEERING DRAWING NO. 60261 SYSTEM SAFETY REV REV DATE DESCRIPTION BY OK’D AP’D

  5. PAINT PREPARATION AND SYSTEMS EGM- EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14 2 COATS HIGH SOLIDS POLYURETHANE B65-300 EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY: 1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600 2 COATS HIGH SOLIDS POLYURETHANE B65-300 ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY: 1 COAT PREPRITE 200 PRIMER B28W200 2 COATS A100 EXTERIOR LATEX SEMI-GLOSS REPLACE HANDRAILS WITH TREAD MOUNTED CODE COMPLIANT RAILING W/ 5’-0” CLEAR BETWEEN RAILS REMOVE SHELTER, EXTEND PLATFORM SLAB 24” AT REAR AND INSTALL NEW SHELTER PAINT HANDRAIL AND CONCRETE PIERS AT BOTTOM (EM& ES) RELOCATE BENCH EXTEND PLATFORM SLAB 24” AT REAR AND INSTALL NEW SHELTER REMOVE VEGETATION AT JOINTS AND APPLY SEALANT STAIRS AT INBOUND SIDE INBOUND END STAIRS AT INBOUND SIDE INBOUND END INBOUND SIDE INBOUND END REPLACE HANDREAILS WITH CODE COMPLIANT RAILING REPLACE EXISTING HANDRAIL REMOVE RUST FROM NOSINGS AND PATCH INSTALL TWO ADDITIONAL HANDRAILS STAIRS AT INBOUND SIDE OUTBOUND END STAIRS AT INBOUND SIDE OUTBOUND END EXTEND PLATFORM 24” AND INSTALL NEWSPAPER CORRAL INSTALL DANGER DO NOT PASS SIGN (TYP AT TWO LOCATIONS) (SF1/D2) STRAIGHTEN BENT WIRE BALUSTERS. PAINT FENCE ALL THE WAY TO ADJACENT BRIDGE (APPROX 450’) INBOUND SIDE INBOUND END INBOUND SIDE OUTBOUND END FENCE AT OUTBOUND SIDE INBOUND END WORK ORDER NO. SCALE:_________________ DATE:_____2/13/09________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM SEDGWICK ARCHITECTURAL PAINTING AND IMPROVEMENT DETAILS CHIEF ENGINEER PROJECT ARCHITECT DRAWING A16 OF A22 SHEET NO. 18 OF 31 DIRECTOR OF ENGINEERING DRAWING NO. 60262 SYSTEM SAFETY REV REV DATE DESCRIPTION BY OK’D AP’D