Several presentations on e-cloud status in LHC LMC 18/09/2013: overview, present status of understanding

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Several presentations on e-cloud status in LHC' - deacon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Several presentations on e-cloud status in LHC
    • LMC 18/09/2013: overview, present status of understanding
    • LBOC 08/10/2013: heat loads in cold magnets and extrapolation to future operation (post-LS1): encouraged effort to make heat load and bunch-by-bunch stable phase monitoring on line for 25 ns run
    • RLIUP Preparation meeting 15/10/2013: overview and extrapolation of heat load values to future operation (post-LS1, PICs, US1, US2) for different scenarios
    • In general, strong endorsement to plan using doublets in LHC after LS1 to try suppressing the e-cloud in the dipoles (will be followed up within the LBOC, already scheduled on 5 November 2013)
  • HL-LHC Triplets
    • WP2 meeting 18/10/2013
      • Summary of understanding of the present triplets
      • Results for the new triplets  need to include in design electron cloud suppression measures (a-C coating and/or clearing electrodes)
  • E-cloud meeting #5
    • Octavio’s rehearsal of PhD defense (mainly LHC results from SS, scrubbing optimization studies with maps, future accelerators)
    • Discussion on sensitivity of build up simulation on model parameters (when defining thresholds for different filling patterns)
slide2
SPS
    • Scrubbing strategy for 2014: Scrubbing run tentatively fixed on weeks 40 – 41. Decision for coating vs. scrubbing to be made by mid 2015 (detailed strategy will be discussed by Hannes in RLIUP)
    • Coating planning for LS2: logistics sorted out (building for coating lab, transportation from the tunnel, production rate, etc.), it should be possible to coat 90% of the SPS within 12 months