An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lakehurst Logistics Status Jamie Green

  2. Topics • Action Item Status • Accomplishments • Technical Manuals (TM’s) • Interim Rapid Action Changes (IRAC’s) • Provisioning • TQG Work Unit Codes (WUCs)

  3. Topics • Actions In Process • ECU Progress (TM/MRC’s, Validation, Training, Robinair) • Update of 19-25-177 Manual • SEC Status - - 5824

  4. Action Item Status • Action Item 2-191 • MALS-13, 04/13/09. NAMP requirement regarding MAF’s and LIR/History Jacket • Response • Lakehurst is not the cognizant authority Recommend this request be identified to CNAF

  5. Action Item Status • Action Item 5-41 • MALS-24, 03/27/09. No MRC Deck or Load Testing, Inspection/NDI for Complexing/Decomplexing Tool (C/DT) • Response • C/DT to be Included in Revised MRC Deck to be Posted by 15 Jun 09 • C/DT will be added to MF Pub, 19-25-177, (ECD Dec 09) • NOTE: No Load Testing requirement for the C/DT

  6. Action Item Status • Action Item 5-48 • MALS-11, 04/07/09. Recommend using MF Config Codes in place of TEC’s • Response • TEC’s are assigned IAW the NAMP, Vol III, Appendix K Config Codes would not work in place of TECs • There are 10 known TECs for MF’s • 7 are for MF’s listed in AUTOSERD, 2 are for MF’s not listed in AUTOSERD but TEC is Active, 1 is for MF not listed in AUTOSERD and the TEC was deleted (see list next slide)

  7. Action Item Status • Response to Action Item 5-48. (continued) • 1. Side Opening A; 1339AS500-1; 013554320; SERD 0005; GMJU • 2. Side Opening B; 1339AS501-1; 013554321; SERD 0006; GMJV • 3. Basic Turnkey A; 1339AS700-1; 013554322; SERD 0003; GMJR • 4. Basic Turnkey B; 1339AS701-1; 013554323; SERD 0004; GMJS • 5. Integration Unit; 1339AS900-2; 013554318; SERD 0002; GMJT • 6. Side Open B (Modified); 1339AS1000-1; 013554319; SERD 0001; GMJ7 • 7. Side Opening C; 1339AS1101-1; 01356566; SERD 0007; GMNB • 8. Basic Unit Type A; 1339AS100-1; 013034192; No SERD; GMJW • 9. Basic Unit Type B; 1339AS100-2; No NIIN; No SERD; GMJX • 10. Van, Maint Air Transportable; G-240-86A; Unk NIIN, Unk SERD; GMJH • (GMJH deleted in 1993)

  8. Action Item Status • Action Item 5-51 • MALS-39, 04/07/09. MF TECs, (GMJW, GMJX, GMJH) re: MRC Deck • Response • TECs GMJW and GMJX were found to be valid but for MF’s that aren’t in AUTOSERD (that’s why they were deleted from Oct 08 MRC)

  9. Action Item Status • Response (continued) • TECs GMJW and GMJX will be restored to the MRC (ECD: 15 Jun 09) • TEC GMJH was valid but deleted in 1993. Need to confirm if fleet still has MFs with this TEC

  10. Accomplishments • Technical Manuals • 17-600-762-6-1, A/E32C-45A ECU Pre-op, posted 9 Apr 09 • 17-600-762-6-2, A/E32C-45A ECU MRC, posted 9 Apr 09 • 19-600-100KW-6-2, 100KW TQG MRC, posted 6 Jan 09 • 19-600-200KW-6-2, 200KW TQG MRC, posted 6 Jan 09 • 19-600-152-6-2, MF MRC, posted 1 Oct 08 • AG-360MF-CCD-000, Configuration Manual, reviewed / provided comments

  11. Accomplishments • IRAC’s • 19-25-177, IRAC No. 008, 152121Z APR 09, Alternative Method for Maintaining ISO Markings • 19-600-152-6-2, IRAC No. 001,111517Z MAY 09, Alternative Cleaning Solution for MF Wash • Will Be included in Next MRC Revision – 15 Jun 09

  12. Accomplishments • Provisioning • ECU Provisioning to NAVICP • LSA 036 Report Complete • LSA 036 to NAVICP 05/09 • MSD 05/10 • Frequency Converter Provisioning • Provisioning data submitted to NAVICP 6/6/08 • Provisioning data rejected for pricing anomalies: 11/17/08 • In process in NAVICP: 1/15/09 • MSD 12/09

  13. Accomplishments • Provisioning • DOD-MEP 200kw TQG • Navy/Marines confirmed as registered user • NSD/MSD: Completed • DOD-MEP 100kw TQG • Provisioning: Navy / Marines confirmed as registered user • NSD / MSD – Completed • DCN Package for Kennel Lights • Fixture, Light, Fluorescent, Two Lamp 9B6220LLW75E081 (Temp NIIN) • Fixture, Light, Fluorescent, Four Lamp 9B6220LLW75E082 (Temp NIIN)

  14. Accomplishments • TQG work Unit Codes (WUC’s) • 100 KW TQG • 200 KW TQG • Assigned October 2008

  15. Actions in Process • ECU • TM 17-1-573. Validation of Vendor Authored Manual Nov 08 • Subsequent Major Rewrite of Some Procedures, Add Robinair, NATEC Format • ECD May 09 • Pre Op and MRC posted to NATEC Apr 09

  16. Actions in Process • ECU (continued) • Factory Training, Feb 09. Additional revision to TM • Developing Intermediate Maintenance Course ECD Aug/Sep 09

  17. Actions in Process • MF Maint. Pub, 19-25-177 • Updates/Revision Required: • SEC 5824 • TPDRs • Complexing/Decomplexing Tool • Estimated Completion: Dec 09

  18. Actions in Process • SEC 5824, Upgrade of Mobile Facility ECU Cooling Cable Circuit to 40 AMPS to Accommodate R134A ECU • SEC Has Been Verified • KINs Assigned; Packaging / Shipping Instructions Established • SEC Kits Will Not be Issued Until 20% of Needed Kits in Stock • DCN package to NAVICP 80% Complete (supply support for kit items) • Will be Included in Revision of -177 Manual (ECD EOM Dec 09)