PUCC Project

PUCC Project. I. E. Ndustrial ngineering 200126162 Ahn T Young 200327183 Jung J Yeop 200327199 Hwang Min. J. Survey. I. Alternative. II. Cost. III. Contents. Problems. IV. I. Survey(1).

dasha
Download Presentation

PUCC Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUCC Project I E Ndustrial ngineering 200126162 Ahn T Young 200327183 Jung J Yeop 200327199 Hwang Min J

  2. Survey I Alternative II Cost III Contents Problems IV

  3. I. Survey(1) • Object : Students of P.N.U • Period : 2007. Sep. ~2007. Nov. • Determining of No. : 384 = • Confidence Lever : 95% • Standard Error : +-5% • Questions • Q1. Have you ever heard P.N.U Underground Campus • Center(PUCC) Project? • Yes(3(0.78%)) No(381(99.22%))

  4. I. Survey(2) • Q2. Do You Agree PUCC Project ? • Yes(302(79%)) No(67(17%)) The Others(15(4%)) • Q3. Why do you agree ? • Convenience of Move (212(51%)) • Improved Utility of Spaces (89(23%)) • Improved Reputation of School (58(15%)) • The Others (25(7%))

  5. I. Survey(3) • Q4. What is your frequent visiting place in P.N.U ? • Own Department Building(117(31%)) • Middle Library(93(24%)) • The Main Gate of School(76(20%)) • The Buk Gate of School(51(13%)) • The Electronic Calculating Building(30(8%)) • The Others(17(4%))

  6. 3026m

  7. I. Survey 734m 485m 250m

  8. 734m

  9. I. Cost (just!!)

  10. Considerations I.E- tical Method Best Solution Another Alternative Additional Cost Construct Period I. Mission & Direction

  11. Coming soon.