los angeles river watershed n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Los Angeles River Watershed PowerPoint Presentation
Download Presentation
Los Angeles River Watershed

Loading in 2 Seconds...

play fullscreen
1 / 16

Los Angeles River Watershed - PowerPoint PPT Presentation


  • 159 Views
  • Uploaded on

Los Angeles River Watershed. Terri Grant Principal Engineer Los Angeles County Flood Control District. LACFCD Map. LACFCD Map. Big Tujunga Dam. Tujunga Spreading Grounds. Sun Valley Park. IN DESIGN. Rory M. Shaw Wetlands Park. 1996. Los Angeles River Master Plan.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Los Angeles River Watershed' - darena


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
los angeles river watershed

Los Angeles River Watershed

Terri Grant

Principal Engineer

Los Angeles County Flood Control District

slide2

LACFCD Map

LACFCD Map

slide6

IN DESIGN

Rory M. Shaw Wetlands Park

slide7

1996

Los Angeles River Master Plan

slide11

IN CONSTRUCTION

Los Angeles River Headwaters Project

slide12

IN CONSTRUCTION

Los Angeles River North Valleyheart Riverwalk Project

slide13

IN PLANNING

Project Limits

Whitsett Av to Riverside Dr

Universal Studios Bike Path

slide14

LA Basin Study Objectives

    • Evaluate existing water conservation system
    • Evaluate potential for new facilities and operational changes for increased capture and recharge to address future conditions
  • Key Considerations
    • Account for projected climate change
    • Population growth

LA Basin Study

slide15

Proposed New Parcel Fee To Finance

    • Stormwater Quality and Water Supply Projects
  • New Revenue of ~$300 million annually
  • Public Hearing Held January – March 2013
    • No majority protest (5.16% of properties protested)
    • Strong concerns from schools, businesses, and some municipalities
    • Board of Supervisors Decided to not move forward at this time
  • Next Steps
      • Investigating opportunities for partnership with sanitation agencies (dry weather flow)
      • League of Cities & California Contract Cities developing recommendations report

Clean Water, Clean Beaches Measure

slide16

Questions?

Terri Grant

Principal Engineer

Los Angeles County Flood Control District