lau gatignon eatm 15 07 2014 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
K12 and ECN3 PowerPoint Presentation
Download Presentation
K12 and ECN3

Loading in 2 Seconds...

play fullscreen
1 / 6
daniel-clemons

K12 and ECN3 - PowerPoint PPT Presentation

98 Views
Download Presentation
K12 and ECN3
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Lau Gatignon, EATM 15-07-2014 K12 and ECN3

  2. Beam line and vacuum • Vacuum tests are under way with the blue tank closed up to straw 4, but without the control system. • The beam line elements are back, apart from the TCX and one QNRB at the beginning of the line. These will be put back and realigned, ideally as soon as the T10 consolidation is completed, hopefully soon. The GTK vacuum chambers must be installed before the end if July. • Beam line vacuum connection and tests can start any time, apart from the front end. • The installation of the double wall / airlock between TCC8 and ECN3 must start now, including the smaller section in GL300. • The big fiscs remain to be installed, once the MUV1 situation is clarified.

  3. NA62 installation • The detector installation is in full swing. • One major activity is the installation of the mirrors inside the RICH. This concerns mainly the NA62 collaborators. • Straw-4 shall arrive in about a month from now. The vacuum commissioning has then to be interrupted and will restart as soon sa the tank is closed again, this time with the control system. • The IRC is on the critical path. The MUV1 also and it remains to be decided if it will be installed for the 2014 run or not.