1 / 11

Improving Delivery of Incentives

Improving Delivery of Incentives. Remember the ECOS/EPA Workgroups?. I do remember the incentives workgroup!. Goal : More Incentives – Faster Delivery Response : Work with States to deliver Existing Flexibilities and other existing Federal/State incentives.

dacia
Download Presentation

Improving Delivery of Incentives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improving Delivery of Incentives

  2. Remember the ECOS/EPA Workgroups? I do remember the incentives workgroup!

  3. Goal: More Incentives – Faster Delivery Response: Work with States to deliver Existing Flexibilities and other existing Federal/State incentives

  4. Why Focus on Existing Flexibilities? • Rulemakings take too long, stir controversy, and are often one-size-fits-all • Existing flexibilities are currently available (duh!) • States/EPA are free to deliver without additional federal rulemaking or federal authority • Can be geared to the member facility’s needs

  5. Cataloging Existing Flexibilities • Researching statutes, regulations, policies, and guidance • Developing lists for air, water, and waste • Version 1.0 of catalogue will be made available for PBEPs to offer members • Destined to be a best-seller!

  6. A Closer Look at What We’re Collecting • Existing flexibility • Type (regulatory, administrative, policy) • Brief description • Reference/link • Target audience/applicability • Examples where applied

  7. Examples of Existing Flexibilities • Permit monitoring parameters • Monitoring frequency • Extending length of permit • Flexible permit to avoid iterative revisions • Streamlined reporting • Electronic reporting

  8. Establishing Incentives Delivery Process Create EPA/State workgroup Collect information to inform workgroup (e.g., existing flexibilities, GA incentives workgroup, other state experiences) Convene workgroup meetings/teleconferences Develop approach that EPA and states can use for processing incentive requests, approving, tracking, delivering, and terminating Prepare guidance and revise as necessary PBEP Facility Incentives

  9. What Might This Look Like? Requested Incentives Facility Name: XYZ Manufacturing Facility Location: Anytown, USA Date accepted: 1/20/2009 √ expedited permit (specify) √ RCRA 180-day √ RCRA self-inspection frequency extended term of permit (specify) √ permit fee reduction √ monitoring frequency (specify)

  10. Questions? Volunteers?

More Related