Air traffic controllers (ATC) consideration and ATC solutions

Air traffic controllers (ATC) consideration and ATC solutions. Session 5 Presentation 4. When will construction begin? What is the daily schedule for work? Will construction vehicles have access to movement areas? Which ones? Who is the point of contact? Telephone Radio frequency.

creola
Download Presentation

Air traffic controllers (ATC) consideration and ATC solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4

  2. When will construction begin? What is the daily schedule for work? Will construction vehicles have access to movement areas? Which ones? Who is the point of contact? Telephone Radio frequency Construction Plan

  3. How are runways typically assigned? Is either a primary arrival or departure runway? Are both runways typically active and used? Multiple or single runway? Can a single runway support the expected traffic volume? How is RWY 6/24 typically used? How is RWY 13/31 typically used? Review Runway Use Plan

  4. Traffic Management • Anticipate potential delays  capacity control or flow control, or a combination • Change of aircraft type  possible need to modify sequence • Limited runway and taxiway availability  develop procedures for the new layout

  5. Weather • Determine the effect on: • Airport capacity • Runway configuration • Availability of precision instrument approaches • Visibility from the tower

  6. Review Tower Staffing Plan: additional staffing: Manage flow control; Coordinate a more complicated ground movement plan; Accommodate more airborne holding; Manage potential ground hold procedures Control movement of construction vehicles to/from the work site ATC specific considerations

  7. Need for up-to-date information  Develop Briefing Package For Air Traffic Controllers : High level briefing covering: Changes to current procedures; Duration and schedule of planned closure; Any changes made in the previous steps; Weekly and/or daily briefings: Construction status; Weather forecast and its possible impact; Problems encountered/lessons learned. ATC specific considerations

  8. THANK YOU