1 / 12

The need for Data sharing, seamless system support need

Civil-Military Cooperation. The need for Data sharing, seamless system support need. Static Data. ATFCM data. IntelliStation POWER 185. IntelliStation POWER 185. IntelliStation POWER 185. IntelliStation POWER 185. Airspace planning data. IntelliStation POWER 185. IntelliStation POWER 185.

conroy
Download Presentation

The need for Data sharing, seamless system support need

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil-Military Cooperation The need for Data sharing, seamless system support need

  2. Static Data ATFCM data IntelliStation POWER 185 IntelliStation POWER 185 IntelliStation POWER 185 IntelliStation POWER 185 Airspace planning data IntelliStation POWER 185 IntelliStation POWER 185 IntelliStation POWER 185 IntelliStation POWER 185 IntelliStation POWER 185 ASM system - NM Overview Network Manager ASM sys NM Systems Event data Real - time airspace status ASM Cluster 1 ASM Cluster 2 ASM Cluster 3 ASM Cluster 4 ASMCluster N

  3. EXCHANGE OF STATIC DATA Airspace data Common static data between different systems allows interoperability and information sharing Consolidated and validated airspace data Consolidated and validated airspace data

  4. Consolidated and validated airspace data on LARA

  5. EXCHANGE OF ATFCM DATA * ATFCM - Air traffic flow and capacity management ATFCM data Awareness on the current demand and capacity planning allows a LARA user to identify and reserve with the least impact on traffic flows and the network Capacity and Flow data Capacity and Flow data

  6. EXCHANGE OF EVENT DATA EVENT data Long term event data feeding the NOP

  7. EXCHANGE OF ASM PLANNING DATA ASM Planning data Provide up-to-date input for demand and capacity balancing

  8. ASM PLANNING DATA / AUP DATA * AUP – Airspace Use Plan

  9. EXCHANGE OF AIRSPACE ACTIVATIONS Airspace Status Provide information to synchronise demand and capacity balancing

  10. AIRSPACE STATUS INFORMATION All CDRs are available All Areas are Inactive Temporary Reserved Area is prior becoming active Temporary Reserved Area is active Intersecting CDRs are closed * CDR – Conditional Route

  11. Real-Time Airspace Status made available by ASM Systems

  12. Conclusion • Operational requirements • System support • The need to deliver • ATM performance

More Related