Potential Second Access

Potential Second Access . Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across from the Devry Institute entrance as shown in bottom left photo.

conley
Download Presentation

Potential Second Access

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potential Second Access • Currently we are working on approval access to 2nd Avenue under CP tracks as shown in top left photo. • Our entrance would be across from the Devry Institute entrance as shown in bottom left photo. • This brings you to the new improved Barlow Trail access currently in the final stages of development for our neighbors, such as Devry Institute Technology, Golder Associates, and Stantec Engineering.

  2. Parking Concept • With an approved access on 3rd Avenue offers us the opportunity to blend two levels of open under- ground parking whereby we only need to shore two sides for major cost savings. • Current similar project now in process with our direct neighbor on the hill (Checker Cabs)

  3. Construction Partner • We have a tenant in one of our other Properties named DOMINION CONSTRUCTION. • We are in current negotiations regarding our new Property Development utilizing the services of Dominion Construction. • Dominion has achieved many award winning buildings • In the Construction Management delivery format the Owner contracts separately with the Architect and Contractor.

  4. Dominion Construction • In this role as Construction Manager, Dominion acts as an agent for Global Ocean Properties to prepare, tender and manage trade contracts and provide costing, scheduling and value engineering input to the design. As part of this role Dominion provides experienced on-site supervision of the trades and is responsible for fulfilling most general requirements. • Dominion utilizes a refinement to Construction Management called Integrated Management where the contracts of the Architect and Contraction Manager are linked so that the design team has direct responsibility (using input from the Construction Manager) to ensure the design meets budget and schedule objectives and the Construction Manager takes into account important design and programming objectives in recommending alternative systems, finishes or detail. • Construction Management may be converted to a Guaranteed Maximum Price format. This is usually done once the major trades have been tendered so Global Ocean Properties gets the advantage of competitive trade pricing in the Guaranteed Maximum Price provided by the Construction Manager. • Dominion's preconstruction services include advice regarding cost, schedule, materials, labour, building systems , constructability and construction planning - site logistics, earthwork, craneage, safety, security, materials handling, quality assurance. • To ensure that Global Ocean receives the best value for construction dollars, Dominion provides analysis, pricing and alternatives for all proposed systems, components and materials as the design progresses.

  5. Dominion Construction • Utilizing their extensive experience with a wide variety of building types, systems and materials and augmenting that with direct trade and supplier input enables Dominion to assist our team in optimizing the design. • Advantages of Construction Management include: • Fully competitive trade contractor bidding • Early Construction input to the design-cost and schedule certainty • Trade contractors can be pre-qualified • Facilitates early facility delivery by overlapping design, approvals and construction; able to preorder long lead items • Generally lower fees than general construction • Format can be converted to a lump sum of guaranteed maximum price

  6. Foot Print for Phase 1 Lot 6 B, Block 11 Plan 4706 JK • Lot Area 8607 M2 • 335 Proposed Parking Stalls: • 80 Parking Stalls (underground) • 160 Parking Stalls (exposed underground) • 95 Parking Stalls (Ground level) • Building Area 2200 M2 (23,680 Square Feet) • 6 Storey @2200 M2 = 13,200 M2 = 142,080 Square Feet • Cost Estimate $200.00 p.s.f = $28,416,000.00 • 80 Underground Parking Stalls $2,800,000.00 • 160 Exposed Parking Stalls $3,200,000.00 • Total Approximate Gross Cost $34,416,000.00 • Expected Lease Rate $31.00 = $4,404,480.00 (Net Income) • Cap Rate 7.5% = $58,726,400.00 Total Value

  7. Maximize Space for Phase 1