1 / 6

Project Cuckoo Monthly Review: October 2002

Project Cuckoo Monthly Review: October 2002. Dan Booth Jared Hay Pat Keller. Overview. Milestones Accomplishments Plans Issues. Milestones. lim. x. x  1.0. Accomplishments. Functional Spec v1.0 Project Plan v Started Phase Frequency Detector Design (PFD). Plans.

cole
Download Presentation

Project Cuckoo Monthly Review: October 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Cuckoo Monthly Review:October 2002 Dan Booth Jared Hay Pat Keller University of Portland School of Engineering

  2. Overview • Milestones • Accomplishments • Plans • Issues University of Portland School of Engineering

  3. Milestones University of Portland School of Engineering

  4. lim x x  1.0 Accomplishments • Functional Spec v1.0 • Project Plan v • Started Phase Frequency Detector Design (PFD) University of Portland School of Engineering

  5. Plans • Project Plan v1.0 Approval Meeting • PFD Layout • Design & Layout of Frequency Divider (FD) • Choose/Purchase VCO • Loop Filter Design/Construction • Design Release University of Portland School of Engineering

  6. Issues • Choosing a VCO • Had to return all of our books :( • need to Find The Books (FTB) University of Portland School of Engineering

More Related